CoolShell 3U Generation 2 Installation Manual
Version 1.1
2-2
Themis Computer
2.
Install subrack alignment guide-pins to the rear—2 per side—of the 19” rack
(see
Figure 2-2
) with two screws per guide-pin.
3.
From the front, guide the 3RU subrack through the 19” rack and carefully in-
sert the alignment guide-pins into the alignment holes on the rear of the 3RU
subrack (see
Figure 2-3
).
Caution:
Use industry-standard ESD grounding techniques when handling
all electronic components.
Figure 2-2.
Install Subrack Alignment Guide-Pins onto the 19” Rack
Figure 2-3.
Mate Subrack Alignment Holes with Alignment Guide-Pins
Subrack Alignment Guide-Pins
2.5”
Front View
Note: The 19” rack shown in this
figure is customized.
Subrack Alignment Guide-Pin
2 per side, 4 total
Subrack Alignment Hole
2 per side, 4 total
Note:
Alignment Guide-Pins are installed
directly on the rear uprights of the 19” rack.
Toward Rear
of Subrack
Rear View
Содержание CoolShell 3U
Страница 22: ...xiv Themis Computer CoolShell 3U Generation 2 Installation Manual Version 1 1...
Страница 24: ...xiv Themis Computer CoolShell 3U Generation 2 Installation Manual Version 1 1...
Страница 70: ...A 14 Themis Computer CoolShell 3U Generation 2 Installation Manual Version 1 1...
Страница 118: ...B 48 Themis Computer CoolShell 3U Generation 2 Installation Manual Version 1 1...
Страница 122: ...C 4 Themis Computer CoolShell 3U Generation 2 Installation Manual Version 1 1 Figure C 2 X9DRi F Block Diagram...
Страница 130: ...C 12 Themis Computer CoolShell 3U Generation 2 Installation Manual Version 1 1...
Страница 156: ...CoolShell 3U Generation 2 Installation Manual Version 1 1 Index 6 Themis Computer...