3.
NOTICE!
Property damage due to incorrectly-
aligned platform!
If the platform is not aligned correctly,
the transport locks can be damaged
when moving in.
Put the platform in transport position
(
Chapter 6.6 ‘Operating the machine’
on page 77).
Make sure that the red arrows (
/1) on the
rotating assembly are aligned with one another
when moving into the transport position.
4.
Lower upper boom completely
(
Chapter 6.6 ‘Operating the machine’
5.
Set function selection switch (
) to
[outrigger function] (yellow).
6.
Using the pre-selection lever, select the
) (centre position).
7.
Retract the outriggers evenly according to the
table:
Pre-selection
lever position
Operation
Symbol
Effect
Pull left or right control lever
backwards
All outriggers
retract simulta-
neously
By pressing the control levers slowly, the
speed at which the outriggers retract can
be adapted.
Fig. 62: Red arrows
Fig. 63: Function selection
switch
Fig. 64: Automatic lowering
Operation
13.02.2013
Aerial access platform Leo15GT 2012
83
Содержание LEO 15 GT
Страница 12: ...General 13 02 2013 Aerial access platform Leo15GT 2012 12 ...
Страница 37: ...3914 0095 3914 0021 3914 0054 3914 0021 3914 0053 ...
Страница 39: ......
Страница 58: ...Structure and function 13 02 2013 Aerial access platform Leo15GT 2012 54 ...
Страница 66: ...Transport and storage 13 02 2013 Aerial access platform Leo15GT 2012 62 ...
Страница 106: ...Operation 13 02 2013 Aerial access platform Leo15GT 2012 102 ...
Страница 145: ...Appendix Appendix 13 02 2013 Aerial access platform Leo15GT 2012 141 ...
Страница 146: ...Appendix 13 02 2013 Aerial access platform Leo15GT 2012 142 ...
Страница 148: ...Appendix 13 02 2013 Aerial access platform Leo15GT 2012 144 ...
Страница 149: ...A Combustion engine Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 145 ...
Страница 150: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 146 ...
Страница 151: ...A 1 Gasoline engine Robin Subaru EX 21 Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 147 ...
Страница 152: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 148 ...
Страница 165: ...A 2 Diesel engine Hatz 1B30 optional Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 161 ...
Страница 166: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 162 ...
Страница 167: ...INSTRUCTION BOOK 43380207 ENG 10 05 3 Printed in Germany 33 1B20 1B27 1B30 1B40 1B50 ...
Страница 204: ......
Страница 205: ...B Circuit diagram Circuit diagram 13 02 2013 Aerial access platform Leo15GT 2012 201 ...
Страница 206: ...Circuit diagram 13 02 2013 Aerial access platform Leo15GT 2012 202 ...
Страница 207: ...C Hydraulic plan Hydraulic plan 13 02 2013 Aerial access platform Leo15GT 2012 203 ...
Страница 208: ...Hydraulic plan 13 02 2013 Aerial access platform Leo15GT 2012 204 ...