3.
Anchor and secure the aerial access platform to
the means of transport, e.g. with safety belts in the
lashing eyes (
/1).
4.
The lashing eyes are marked with the
Begin transport.
Unloading from a loading area takes place in reverse.
To do this, proceed as follows:
1.
Back the aerial access platform up slowly.
2.
Before tipping, slow down and drive carefully past
the tipping point.
After passing the tipping point, it is safe to speed
up again.
5.4
Storage
Store the machine under the following conditions:
n
Do not store outdoors.
n
Store dry and dust-free.
n
Do not subject to any aggressive media.
n
Protect against solar radiation.
n
Avoid mechanical shocks.
n
Storage temperature: 15 to 35 °C.
n
Relative humidity: max. 60 %.
n
In case of storage longer than 3 months, check the
condition of all parts regularly. If necessary, freshen
or replace the rust-proofing.
Fig. 39: Lashing eyes
Fig. 40: Lashing eye symbol
Unloading
Storage of the machine
Transport and storage
13.02.2013
Aerial access platform Leo15GT 2012
61
Содержание LEO 15 GT
Страница 12: ...General 13 02 2013 Aerial access platform Leo15GT 2012 12 ...
Страница 37: ...3914 0095 3914 0021 3914 0054 3914 0021 3914 0053 ...
Страница 39: ......
Страница 58: ...Structure and function 13 02 2013 Aerial access platform Leo15GT 2012 54 ...
Страница 66: ...Transport and storage 13 02 2013 Aerial access platform Leo15GT 2012 62 ...
Страница 106: ...Operation 13 02 2013 Aerial access platform Leo15GT 2012 102 ...
Страница 145: ...Appendix Appendix 13 02 2013 Aerial access platform Leo15GT 2012 141 ...
Страница 146: ...Appendix 13 02 2013 Aerial access platform Leo15GT 2012 142 ...
Страница 148: ...Appendix 13 02 2013 Aerial access platform Leo15GT 2012 144 ...
Страница 149: ...A Combustion engine Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 145 ...
Страница 150: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 146 ...
Страница 151: ...A 1 Gasoline engine Robin Subaru EX 21 Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 147 ...
Страница 152: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 148 ...
Страница 165: ...A 2 Diesel engine Hatz 1B30 optional Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 161 ...
Страница 166: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 162 ...
Страница 167: ...INSTRUCTION BOOK 43380207 ENG 10 05 3 Printed in Germany 33 1B20 1B27 1B30 1B40 1B50 ...
Страница 204: ......
Страница 205: ...B Circuit diagram Circuit diagram 13 02 2013 Aerial access platform Leo15GT 2012 201 ...
Страница 206: ...Circuit diagram 13 02 2013 Aerial access platform Leo15GT 2012 202 ...
Страница 207: ...C Hydraulic plan Hydraulic plan 13 02 2013 Aerial access platform Leo15GT 2012 203 ...
Страница 208: ...Hydraulic plan 13 02 2013 Aerial access platform Leo15GT 2012 204 ...