Speed adjuster, standard version
13
– Set speed adjustment lever „1“ either to 1/2
START or max. START position, as desired or
necessary.
Starting at a lower speed will help to prevent
exhaust smoke.
Speed adjuster with pull rod
14
– Move speed adjuster to the „START/RUN“
position.
Now, the engine is ready for starting.
15
Never use starting sprays !
Important !
After long-time standstill (approx. 6 months or
even longer) or first operation, operate engine
with low adjusted speed and without load for
approx. 20 sec. after start. This measure assures
a lubrication of all bearings before increasing
speed and load.
It also prevents an insufficient lubrication.
050 145 00
11
Содержание LEO 15 GT
Страница 12: ...General 13 02 2013 Aerial access platform Leo15GT 2012 12 ...
Страница 37: ...3914 0095 3914 0021 3914 0054 3914 0021 3914 0053 ...
Страница 39: ......
Страница 58: ...Structure and function 13 02 2013 Aerial access platform Leo15GT 2012 54 ...
Страница 66: ...Transport and storage 13 02 2013 Aerial access platform Leo15GT 2012 62 ...
Страница 106: ...Operation 13 02 2013 Aerial access platform Leo15GT 2012 102 ...
Страница 145: ...Appendix Appendix 13 02 2013 Aerial access platform Leo15GT 2012 141 ...
Страница 146: ...Appendix 13 02 2013 Aerial access platform Leo15GT 2012 142 ...
Страница 148: ...Appendix 13 02 2013 Aerial access platform Leo15GT 2012 144 ...
Страница 149: ...A Combustion engine Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 145 ...
Страница 150: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 146 ...
Страница 151: ...A 1 Gasoline engine Robin Subaru EX 21 Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 147 ...
Страница 152: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 148 ...
Страница 165: ...A 2 Diesel engine Hatz 1B30 optional Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 161 ...
Страница 166: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 162 ...
Страница 167: ...INSTRUCTION BOOK 43380207 ENG 10 05 3 Printed in Germany 33 1B20 1B27 1B30 1B40 1B50 ...
Страница 204: ......
Страница 205: ...B Circuit diagram Circuit diagram 13 02 2013 Aerial access platform Leo15GT 2012 201 ...
Страница 206: ...Circuit diagram 13 02 2013 Aerial access platform Leo15GT 2012 202 ...
Страница 207: ...C Hydraulic plan Hydraulic plan 13 02 2013 Aerial access platform Leo15GT 2012 203 ...
Страница 208: ...Hydraulic plan 13 02 2013 Aerial access platform Leo15GT 2012 204 ...