5.3.3. Checking and adjusting valve
clearances
Remark:
Following steps are inapplicable in case equip-
ment is with automatic tappet clearance com-
pensation.
Identification characteristic is maintenance plan,
chapter 5.1.
Only carry out adjustments when the engine is
cold (10 - 30 °C).
39
– Remove cover to air filter.
40
– Remove noise insulating hood.
2443 / 12
41
– On version with oilbath air cleaner, remove
screw „2“ and take off cover plate with noise-
insulating hood.
– Remove any contamination adhering to the
cover for the cylinder head.
42
– Remove screws „1“ and take off the cylinder
head cover with gasket „2“.
1
2
2442 / 1
8
23
Содержание LEO 15 GT
Страница 12: ...General 13 02 2013 Aerial access platform Leo15GT 2012 12 ...
Страница 37: ...3914 0095 3914 0021 3914 0054 3914 0021 3914 0053 ...
Страница 39: ......
Страница 58: ...Structure and function 13 02 2013 Aerial access platform Leo15GT 2012 54 ...
Страница 66: ...Transport and storage 13 02 2013 Aerial access platform Leo15GT 2012 62 ...
Страница 106: ...Operation 13 02 2013 Aerial access platform Leo15GT 2012 102 ...
Страница 145: ...Appendix Appendix 13 02 2013 Aerial access platform Leo15GT 2012 141 ...
Страница 146: ...Appendix 13 02 2013 Aerial access platform Leo15GT 2012 142 ...
Страница 148: ...Appendix 13 02 2013 Aerial access platform Leo15GT 2012 144 ...
Страница 149: ...A Combustion engine Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 145 ...
Страница 150: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 146 ...
Страница 151: ...A 1 Gasoline engine Robin Subaru EX 21 Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 147 ...
Страница 152: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 148 ...
Страница 165: ...A 2 Diesel engine Hatz 1B30 optional Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 161 ...
Страница 166: ...Combustion engine 13 02 2013 Aerial access platform Leo15GT 2012 162 ...
Страница 167: ...INSTRUCTION BOOK 43380207 ENG 10 05 3 Printed in Germany 33 1B20 1B27 1B30 1B40 1B50 ...
Страница 204: ......
Страница 205: ...B Circuit diagram Circuit diagram 13 02 2013 Aerial access platform Leo15GT 2012 201 ...
Страница 206: ...Circuit diagram 13 02 2013 Aerial access platform Leo15GT 2012 202 ...
Страница 207: ...C Hydraulic plan Hydraulic plan 13 02 2013 Aerial access platform Leo15GT 2012 203 ...
Страница 208: ...Hydraulic plan 13 02 2013 Aerial access platform Leo15GT 2012 204 ...