OPERATION
235 MM166 (3--93)
2-10
MACHINE OPERATION
NORMAL SWEEPING OPERATION
A normal sweeping operation consists of seven
typical operations: pre-start checklist, starting
machine, sweeping, dumping hopper, post
operation checklist -- engine operating, stopping
machine, and post operation checklist -- engine
stopped.
The
PRE-START CHECKLIST
lists things to
check before starting the machine.
TO START MACHINE
lists the steps required to
start the machine.
TO SWEEP
lists things to keep in mind before
and during the sweeping operation.
TO DUMP HOPPER
lists the steps required to
dump the hopper.
POST OPERATION CHECKLIST -- ENGINE
OPERATING
lists things to check before stopping
the machine engine.
TO STOP MACHINE
lists the steps required to
stop the machine.
The
POST OPERATION CHECKLIST -- ENGINE
STOPPED
lists things to check after stopping the
machine engine.
PRE-START CHECKLIST
Check under the machine for leak spots.
Check the engine lubricating oil level.
Check the fuel level.
Check for LPG odor or frosting on hoses or
components indicating a leak.
Check the brakes and controls for proper
operation.
Check the service records to determine service
requirements.
TO START MACHINE
NOTE: Before starting machine, perform the
pre-start checks.
1. LPG powered machines: Slowly open the
LPG tank service valve.
NOTE: Opening the service valve too quickly may
cause the service valve check valve to stop the
flow of LPG fuel. If the check valve stops the flow
of fuel, close the service valve, wait a few
seconds, and slowly open the valve once again.
2. The machine operator must be in the
operator’s seat with the directional pedal in
the “neutral”position and with a foot on the
brake pedal or with the parking brake set.
FOR SAFETY: Before Starting Machine; Make
Sure All Safety Devices Are In Place And
Operate Properly, Check Brakes And Steering
For Proper Operation.
3. Gasoline powered machines: When the
engine is cold, pull out the choke knob about
three-fourths of the way. Push choke in after
the engine has started and is running
smoothly.
4. Gasoline powered machines: Move the
throttle control lever to the “IDLE”position.
LPG powered machines: Move the throttle
control lever to the “HIGH”position.
5. Turn the ignition switch key to the “START”
position until the engine starts.
NOTE: Do not operate the starter motor for more
than 10 seconds at a time or after the engine has
started. Allow the starter to cool between starting
attempts. The starter motor may be damaged if it
is operated incorrectly.
6. Allow the engine and hydraulic system to
warm up three to five minutes.
7. Release the machine parking brake.
8. Move the throttle control lever to the “FULL”
position, and drive the machine to the area
to be swept.
Содержание 235
Страница 1: ...235 MM166 Operator Manual ...
Страница 6: ...ABOUT THIS MANUAL 235 MM166 5 91 d ...
Страница 14: ...SPECIFICATIONS 235 MM166 5 91 1 2 ...
Страница 18: ...SPECIFICATIONS 235 MM166 5 91 1 6 ...
Страница 20: ...OPERATION 235 MM166 5 91 2 2 ...
Страница 36: ...OPERATION 235 MM166 5 91 2 18 ...
Страница 49: ...MAINTENANCE 3 13 235 MM166 3 94 03460 HYDRAULIC SCHEMATIC ...
Страница 61: ...MAINTENANCE 3 25 235 MM166 3 94 03489 ELECTRICAL SCHEMATIC ...
Страница 62: ...MAINTENANCE 235 MM166 3 94 3 26 03489 ELECTRICAL SCHEMATIC AUXILIARY SIDE BRUSH ...
Страница 78: ...MAINTENANCE 235 MM166 3 94 3 42 ...
Страница 80: ...APPENDIX 235 MM166 5 91 4 2 ...