INSTRUMENT MANUAL
VACUUM GAUGE MODEL MM200
160Phone:(215) 947-2500 fax:(215) 947-7464 e-mail:[email protected] web site:www.televac.com
MM-200_im REV M
Page 62 of 160
TELEVAC
DEGAS TIMER
Press SETUP. FIL
5
on
Press SETUP again. If the pressure is below 1 x 10
-5
Torr and the
gauge tube is lighted, the following degas display will appear.
The DEGAS is off - 0 minutes.
Press the UP-ARROW to increase DEGAS time.
Press DOWN-ARROW to decrease.
PRESS SETUP OR TEST/OP TO RETURN TO NORMAL
DISPLAY OF PRESSURE. Remaining degas time will flash on the
right hand side display. Model 3E does not measure during DEGAS.
3. RELAY SETPOINTS
SP #1 - STATION ASSIGNMENT
- When the SETUP button is pressed, the displays change their functions. When
ion gauges (hot cathode and cold cathode) are present, the following displays follow those described for the ion
gauges installed.
The large left-hand display changes to "SP 1", indicating that setpoint #1 is about to be assigned, set or simply
viewed. The right-hand station display is blanked. The left-hand station display indicates the station that setpoint
#1 is currently assigned to (e.g., station #1) and starts to blink. The right-hand large display then indicates what
type of sensor is installed in that station, e.g., "2A" (See Fig. 5.1). Pressing either of the left-hand UP/DOWN
arrows changes the station to which setpoint #1 is assigned.
Fig. 5.1
.
5
.
1