![Tektronix TLA 700 Series Скачать руководство пользователя страница 36](http://html1.mh-extra.com/html/tektronix/tla-700-series/tla-700-series_installation-manual_1078203036.webp)
Basic Installation
TLA700 Series Logic Analyzer Installation Manual
19
AC power and fuse
Figure 14: Line fuse and power cord connector locations
CAUTION.
To avoid overloading the power distribution system, if you have four
or more modules in your mainframe, you must determine the correct fuse and
power cord combination.
Although the benchtop mainframe can use the power cord with the 15 A plug,
mainframes operating at low line (90 VAC) with four or more instrument
modules may require the power cord with the 20 A plug.
See
Appendix A: Power Cord and Line Fuse Requirements for the Benchtop
Mainframe
for further information.
4.
Press the On/Standby switch to turn on the mainframe (see Figure 15 for the
switch location).
5.
Wait for the mainframe to complete the power-on self-tests and start
Windows.