TechnoAlpin M20
- 11 -
5.1
STARTING
THE
M20
SNOW
MACHINE
EBENE 1
WASSERDRUCK
REL FEUCHTE
STATUS
WASSERDURCH
WASSERTEMP
LUFTTEMP
LEVEL 1 AIR TEMP. WATER PRESSURE REL. HUM. HUMID BULB TEMP.
STATUS WATER CAPACITY WATER TEMP.
Before the snow machine is started up by an appropriately trained
technician, the following must be observed:
The current EC designated norms in terms of security mechanisms must be laid out in the working area. .
The snow machine must be solidly fixed to its site.
The hydraulic connections will have to be tested.
The electrical supply must be sound and all cables must be intact.
No unauthorized persons should be in the area surrounding the snow machine.
1. The electrical supply must be connected and the main switch must be on Position 1 (switched on).
A sign now appears on the display.
2. Connect the water supply to the snow machine.
Attention: Before starting the snow machine all the safety instructions must be read through and followed in a
precise manner.
ATTENTION:
Before starting you must be absolutely sure that the ventilator pipe is free
(intake- and power out area). The ventilator impeller wheel must be able
to freely turn and can in no case be iced over.
The snow machine can be started from each data field of level 1.
(also valid for level 2)
Bring the main switch on to position 1(turned on). The following data is seen on the display. (illustration 1):
illustration 1
Auto
shows that the snow machine is in automatic operation (default).
The operation condition will be shown on the three lines _ _ _ : the heating (appears as H on the first
line, when it is switched on), the compressor (appears as C on the second line when switched on)
and the turbine (T on the third line, when switched on).
Auto - 30 °C
_ _ _ 0 Off