Proline Promass F 500 EtherNet/IP
Commissioning
123
10
Commissioning
10.1 Function check
Before commissioning the measuring device:
‣
Make sure that the post-installation and post-connection checks have been performed.
• "Post-installation check" checklist→ 37
• "Post-connection check" checklist → 72
10.2 Switching on the measuring device
‣
After a successful function check, switch on the measuring device.
After a successful startup, the local display switches automatically from the startup
display to the operational display.
If nothing appears on the local display or a diagnostic message is displayed, refer to
the section on "Diagnostics and troubleshooting" → 210.
10.3 Connecting via FieldCare
• For FieldCare → 98 connection
• For connecting via FieldCare → 102
• For the FieldCare → 103 user interface
10.4 Setting the operating language
Factory setting: English or ordered local language