TB9100 Installation and Operation Manual
Replacing Modules
79
© Tait Electronics Limited May 2006
3.
At the front of the reciter, unplug the DC input cable
e
and the RF
output cable
f
, and move both cables to one side. Unplug both ends
of the system control bus loom
g
and remove it.
4.
Loosen the screw securing the retaining clamp
h
and rotate the
clamp through 90° to clear the module.
5.
Slide the reciter out of the subrack, taking care not to damage any of
the cables.
Refitting
1.
Slide the replacement reciter into the subrack and secure it with the
retaining clamp.
2.
Reconnect all the front and rear panel cables previously disconnected.
Ensure the front panel cables are retained by the cable retaining clips
j
in the top of the subrack.
Important
Do not
force the system control bus behind the reciter
handle as this may damage the ribbon cable.
Note
If you need to remove any front panel cables, simply pull the front
of the cable retaining clip down and then slide it out from the
subrack until it reaches the end of its travel.
3.
Tighten the nut on the SMA connector to a torque of 8lbf·in
(0.9N·m).
4.
Refit the control panel, as described in
5.
Carry out the instructions in
b
c
d
g
f
h
e
j
(obscured)
Содержание TB9100
Страница 1: ...MBA 00002 05 Issue 5 May 2006 TB9100 base station Installation and Operation Manual...
Страница 6: ...6 TB9100 Installation and Operation Manual Tait Electronics Limited May 2006 Glossary 131...
Страница 26: ...26 Description TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Страница 34: ...34 Maintenance TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Страница 60: ...60 Installation TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Страница 70: ...70 Base Station Operation TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Страница 74: ...74 TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Страница 122: ...122 Technical Description TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Страница 126: ...126 Appendix A Interface Pin Assignments TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Страница 130: ...130 Appendix B Inter Module Connections TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...