
TB9100 Installation and Operation Manual
Base Station Operation
69
© Tait Electronics Limited May 2006
5.4
Monitoring Front Panel Fan Operation
You can test that the PA and PMU fans are working by requesting the base
station to turn them on. This is done via the CSS Diagnose section and is
recommended after fixing a fault or replacing a fan. When you fit a fan, use
this test to check that the fan is correctly connected to the appropriate PA
or PMU. The CSS will toggle the fan on for a set number of seconds, then
the test will end and control of the fan will revert back to the base station.
Содержание TB9100
Страница 1: ...MBA 00002 05 Issue 5 May 2006 TB9100 base station Installation and Operation Manual...
Страница 6: ...6 TB9100 Installation and Operation Manual Tait Electronics Limited May 2006 Glossary 131...
Страница 26: ...26 Description TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Страница 34: ...34 Maintenance TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Страница 60: ...60 Installation TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Страница 70: ...70 Base Station Operation TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Страница 74: ...74 TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Страница 122: ...122 Technical Description TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Страница 126: ...126 Appendix A Interface Pin Assignments TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Страница 130: ...130 Appendix B Inter Module Connections TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...