TB9100 Installation and Operation Manual
Technical Description
115
© Tait Electronics Limited May 2006
PMU Operation on DC Input
The operation of the PMU on DC input is controlled by three sets of
parameters:
■
user-programmable alarms
■
user-programmable startup and shutdown limits
■
battery protection limits
The voltage range for each of these parameters is provided in
illustrates how these parameters interact,
and how they control the operation of the PMU over a range of DC input
voltages.
Alarms
User-programmable alarms can be set for low or high battery voltage. The
alarms will be triggered when the set voltage levels are reached.
Table 8.3
PMU 1ndicator LED states
Green
Red
PMU condition
off
off
power off (input above or below safe operating range)
flashing (3 Hz)
off
no application firmware loaded; use the CSS to download the
firmware
on
off
the microprocessor is operating; no alarm detected
on
flashing (3 Hz)
one or more alarm conditions indicated:
■
output is overvoltage
■
output is undervoltage
■
output is current-limiting
■
overtemperature
■
mains failure
■
battery voltage is low
■
battery voltage is high
■
shutdown is imminent
■
DC converter is faulty
■
battery is faulty, or DC converter is switched off
■
auxiliary power supply is faulty
■
PMU is not calibrated
■
self-test has failed
■
PMU is not configured
flashing (on 300ms,
off 2700ms)
flashing (on 300ms,
off 2700ms)
PMU is in battery protection mode
flashing (on 300ms,
off 4700ms)
flashing (on 300ms,
off 4700ms)
PMU is in Deep Sleep mode
flashing (3 Hz)
flashing (3 Hz)
CSS LED test - LEDs flash alternately
Содержание TB9100
Страница 1: ...MBA 00002 05 Issue 5 May 2006 TB9100 base station Installation and Operation Manual...
Страница 6: ...6 TB9100 Installation and Operation Manual Tait Electronics Limited May 2006 Glossary 131...
Страница 26: ...26 Description TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Страница 34: ...34 Maintenance TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Страница 60: ...60 Installation TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Страница 70: ...70 Base Station Operation TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Страница 74: ...74 TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Страница 122: ...122 Technical Description TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Страница 126: ...126 Appendix A Interface Pin Assignments TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...
Страница 130: ...130 Appendix B Inter Module Connections TB9100 Installation and Operation Manual Tait Electronics Limited May 2006...