
3
Commissioning
n
Check that the plant main switch (if installed) is switched on.
n
Check that the controller is switched on and energised.
n
Check that all segments on the display are shown briefly
(
Ä
Chapter 4.2 “Display” on page 14).
n
Check that the software number and version are displayed (e.g.
519803 / SW 1.01).
The commissioning menu is displayed during initial
start-up and after a factory reset
BAS12 RESET
. This
is used to set the basic parameters.
1.
In order to switch from
ENGLISH
to
DEUTSCH
for example, press
the
buttons.
ð
DEUTSCH
flashes.
Measures prior to commissioning
ES 5941
Commissioning
08/2020 Item no. 215790 EA no. 1321
Operating instructions
10