
deltawaveC-P
User manual
systec Controls Mess- und Regeltechnik GmbH 29/139
www.systec-controls.de
7.
Preparing for measurement
The following section elaborates on essential aspects that must be taken
into account for successful flow rate measurements.
7.1.
Required straight runs
The selection of the mounting location has a significant impact on
measurement quality. Particularly the charge and discharge area listed in
the following table should be taken into account