Section III: Operation
3.0.OPE.SL-212
PLACING A CONTAINER ON THE GROUND:
STEP 1.
Move the sliding jib all the way back (right control backward) until mechanical jib latches unlock.
STEP 2.
Tilt the arm backwards (left control backward). When the container touches the ground, release
the brakes to free the truck for forward movement caused by the container.
STEP 3.
Rotate jib all the way back until the container touches the ground. Pull away from container and
rotate jib back into the transport position.
WARNING:
1. DON'T OVER SPEED THE PUMP 1,500 RPM
MAXIMUM.
2. DON'T DUMP, MOUNT OR DISMOUNT BODIES
ON UNEVEN GROUND.
3.
DON'T DRIVE WITH THE HOIST IN THE DUMP
POSITION OR WITH THE HOOK TILTED BACK.
3-3
Содержание SL-212
Страница 1: ... Hooked on Quality PA R T S A N D O P E R AT I O N M A N U A L HOIST SERIAL NUMBER MODEL SL 212 ...
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 45: ...Section II Installation Accessories 2 7 INS ACC LEDLB 2 27 ...
Страница 56: ......
Страница 58: ...Section IV Maintenance 4 0 MAI SL 212 LUBRICATION DIAGRAM LEGEND GW Grease Weekly GM Grease Monthly 4 2 ...
Страница 66: ......
Страница 78: ......
Страница 86: ......
Страница 87: ......
Страница 88: ...1800 NE BROADWAY AVENUE DES MOINES IA 50313 TOLL FREE 888 767 8000 FAX 515 313 4426 ...