SWL-869 SWAPLOADER 11/13
PRE-DELIVERY CHECK LIST
INSPECTOR
’S INFORMATION
Inspected By:
Distributor:
Customer:
Signature:
Date Installed:
Date Inspected:
I.
COMPONENT INFORMATION
Hoist Model:
Hoist Serial No.:
Chassis VIN:
Chassis Make & Model:
Chassis GVWR:
Chassis CA / CT:
After Frame:
PTO Make:
PTO Model:
PTO Serial No.:
PTO % of Engine RPM:
Hyd. Pump Make:
Hyd. Pump Model:
Hyd. Pump Serial No.:
Distance from rear of cab to the
centerline of rear axle/tandem.
Distance from centerline of rear
axle/tandem to rear of hoist.
II. INSTALLATION TO CHASSIS
Were there any problems installing the hoist to the truck chassis?
YES
NO
If yes, please describe:
All bolts checked for proper tightness.
Please include photos of the hoist installed on the truck chassis.
Be sure to include at least one photo from each side of the chassis/hoist.
Содержание SL-212
Страница 1: ... Hooked on Quality PA R T S A N D O P E R AT I O N M A N U A L HOIST SERIAL NUMBER MODEL SL 212 ...
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 45: ...Section II Installation Accessories 2 7 INS ACC LEDLB 2 27 ...
Страница 56: ......
Страница 58: ...Section IV Maintenance 4 0 MAI SL 212 LUBRICATION DIAGRAM LEGEND GW Grease Weekly GM Grease Monthly 4 2 ...
Страница 66: ......
Страница 78: ......
Страница 86: ......
Страница 87: ......
Страница 88: ...1800 NE BROADWAY AVENUE DES MOINES IA 50313 TOLL FREE 888 767 8000 FAX 515 313 4426 ...