Section II: Installation
2.0.INS.SL-212
with chassis components. Also allow for mounting the control valve assembly and the
hydraulic tank. You should consult the truck chassis supplier for any limitations regarding
drilling mount holes in the truck chassis frame rails. Typically, the holes must be at least 2
3/4” from the top of the truck chassis rails (reference
Fig. C, Fig. D & Fig. E
). Mid brackets
will have more flexibility due to the additional row of holes in the Main Frame and allows for
drilling into the truck chassis frame rails at 2 3/4”, 3 3/4” or 4 3/4”
(bolts are only required
on two of the four lower mount bracket holes).
Once the locations of the mount brackets
have been determined, use the mount brackets as a template for marking the mounting
holes in the truck chassis frame rails. Drill the 17/32” diameter holes required and attach the
brackets to the truck chassis with the 1/2” diameter bolts, washers, and locking hex nuts
provided. Torque to 110 ft.lb.
3. Bolt the mount brackets to
the hoist main frame as
indicated on
Fig. C, D and E
.
You may need to modify the
mount brackets or add shim
plates to allow for variances
in the width of the truck
chassis as well as to allow
for top rivets, stepped
channels, etc.
Figure C
Figure D
Figure E
2-3
Figure
C
Содержание SL-212
Страница 1: ... Hooked on Quality PA R T S A N D O P E R AT I O N M A N U A L HOIST SERIAL NUMBER MODEL SL 212 ...
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 45: ...Section II Installation Accessories 2 7 INS ACC LEDLB 2 27 ...
Страница 56: ......
Страница 58: ...Section IV Maintenance 4 0 MAI SL 212 LUBRICATION DIAGRAM LEGEND GW Grease Weekly GM Grease Monthly 4 2 ...
Страница 66: ......
Страница 78: ......
Страница 86: ......
Страница 87: ......
Страница 88: ...1800 NE BROADWAY AVENUE DES MOINES IA 50313 TOLL FREE 888 767 8000 FAX 515 313 4426 ...