6-22 ELECTRICAL SYSTEM
• Repeat the above procedure a few times and measure the
highest CKP sensor peak voltage.
W
Tester knob indication: Voltage (
)
CKP sensor peak voltage: 1.5 V and more
If the peak voltage measured on the CDI unit coupler is lower
than the standard value, measure the peak voltage on the gen-
erator coupler as follows.
• Remove the left footrest mudguard. (
5-5)
• Disconnect the generator coupler
2
and connect the
multi-circuit tester with the peak volt adaptor as follows.
CKP sensor:
+
Probe...Brown lead wire
-
Probe...Ground
Measure the CKP sensor peak voltage in the same manner as
on the CDI unit coupler.
W
Tester knob indication: Voltage (
)
CKP sensor peak voltage: 1.5 V and more
If the peak voltage on the generator coupler is within the specifi-
cation, but on the CDI unit coupler is not within specification,
replace the wiring harness with a new one. If both peak voltages
are not within specification, replace the generator coil with a new
one.
CKP SENSOR RESISTANCE
• Remove the left footrest mudguard. (
5-5)
• Disconnect the generator coupler
1
.
Measure the resistance with the multi-circuit tester. If the resis-
tance is not within the standard range, replace the generator
coil.
\
09900-25008: Multi-circuit tester set
V
Tester knob indication: Resistance (
W
)
CKP sensor resistance: 150 – 230
W
(Brown – Ground)
Peak volt adaptor
CKP
sensor
W/R Br
Generator
Содержание LT-Z90K7
Страница 1: ...9 9 5 0 0 4 0 0 2 0 0 1 E ...
Страница 38: ...PERIODIC MAINTENANCE 2 25 ...
Страница 39: ...2 26 PERIODIC MAINTENANCE ...
Страница 131: ...4 10 FUEL SYSTEM Remove the choke lever J Remove the starter plunger K ...
Страница 234: ...7 18 SERVICING INFORMATION FUEL HOSE PIPING Fuel tank breather hose Handlbers Vacum hose Clip Clip Fuel hose Fuel valve ...
Страница 237: ...SERVICING INFORMATION 7 21 EXHAUST PIPE COVER 8 5 8 5 8 5 5 6 4 5 ...
Страница 251: ...Prepared by September 2006 Part No 99500 40020 01E Printed in Japan 254 ...
Страница 252: ...Printed in Japan K7 ...