3-8 ENGINE
• Install the muffler
3
and exhaust pipe
4
.
• Tighten the muffler mounting bolt and exhaust pipe bolt to the
specified torque.
"
Muffler mounting bolt: 23 N·m (2.3 kgf-m, 16.5 lb-ft)
Exhaust pipe bolt: 23 N·m (2.3 kgf-m, 16.5 lb-ft)
• Tighten the muffler clamp bolt to the specified torque.
"
Muffler clamp bolt: 12 N·m (1.2 kgf-m, 8.5 lb-ft)
• Install the carburetor assembly. (
4-13)
• After remounting the engine, route the wiring harness, cables
and hoses properly. (
7-15)
• Adjust the following items.
* Engine oil (
2-10)
* Throttle cable play (
2-13)
* Engine idle speed (
2-13)
* Drive chain slack (
2-18)
The removed gasket must be replaced with a new one
to prevent exhaust gas leakage.
Содержание LT-Z90K7
Страница 1: ...9 9 5 0 0 4 0 0 2 0 0 1 E ...
Страница 38: ...PERIODIC MAINTENANCE 2 25 ...
Страница 39: ...2 26 PERIODIC MAINTENANCE ...
Страница 131: ...4 10 FUEL SYSTEM Remove the choke lever J Remove the starter plunger K ...
Страница 234: ...7 18 SERVICING INFORMATION FUEL HOSE PIPING Fuel tank breather hose Handlbers Vacum hose Clip Clip Fuel hose Fuel valve ...
Страница 237: ...SERVICING INFORMATION 7 21 EXHAUST PIPE COVER 8 5 8 5 8 5 5 6 4 5 ...
Страница 251: ...Prepared by September 2006 Part No 99500 40020 01E Printed in Japan 254 ...
Страница 252: ...Printed in Japan K7 ...