3-76 ENGINE
NOTE:
Make sure that the "up mark"
A
comes to the upper side.
• After installing the cam chain tension adjuster, rotate the
crankshaft, and recheck the positions of the camshafts.
(
3-9)
• Apply SUZUKI SUPER GREASE “A” to the O-ring
4
.
• Tighten the generator cover cap
5
and valve timing inspec-
tion plug
6
.
X
99000-25030: SUZUKI SUPER GREASE “A”
(or equivalent)
"
Generator cover cap: 15 N·m (1.5 kgf-m, 11 lb-ft)
Valve timing inspection plug:
17.5 N·m (1.75 kgf-m, 12.5 lb-ft)
CYLINDER HEAD COVER
• Thoroughly wipe off oil from the fitting surfaces of the cylinder
head and cover.
• Apply SUZUKI BOND “1215” to the end caps of the cylinder
head cover gasket as shown.
E
99000-31230: SUZUKI BOND “1215”
(or equivalent bond)
After installing the cam chain tension adjuster, check
to be sure that the adjuster works properly by check-
ing the slack of cam chain.
The removed O-ring must be replaced with a new one.
The removed gasket must be replaced with a new one
to prevent oil leakage.
Содержание LT-Z90K7
Страница 1: ...9 9 5 0 0 4 0 0 2 0 0 1 E ...
Страница 38: ...PERIODIC MAINTENANCE 2 25 ...
Страница 39: ...2 26 PERIODIC MAINTENANCE ...
Страница 131: ...4 10 FUEL SYSTEM Remove the choke lever J Remove the starter plunger K ...
Страница 234: ...7 18 SERVICING INFORMATION FUEL HOSE PIPING Fuel tank breather hose Handlbers Vacum hose Clip Clip Fuel hose Fuel valve ...
Страница 237: ...SERVICING INFORMATION 7 21 EXHAUST PIPE COVER 8 5 8 5 8 5 5 6 4 5 ...
Страница 251: ...Prepared by September 2006 Part No 99500 40020 01E Printed in Japan 254 ...
Страница 252: ...Printed in Japan K7 ...