ELECTRICAL SYSTEM
7-21
PICKUP COIL AND SIGNAL COIL RESISTANCE
Remove the left frame cover. (
6-2)
Disconnect the generator coupler
1
.
Measure the resistance between the lead wires using the multi
circuit tester. If the resistance is not within the specified value,
the pickup coil and signal coil must be replaced.
09900-25008: Multi circuit tester set
Tester knob indication: Resistance (
Ω
Ω
Ω
Ω
Ω
)
Pickup coil resistance: 390 – 600
Ω
Ω
Ω
Ω
Ω
(Blue – Green)
Signal coil resistance: 0.05 – 0.20
Ω
Ω
Ω
Ω
Ω
(Black – White)
1
Содержание drz 400E
Страница 1: ...DR Z400 E 9 9 5 0 0 4 3 0 2 2 0 1 E...
Страница 39: ...PERIODIC MAINTENANCE 2 25 D 0 2 U 1 3 A B C 7 6 4 5 8 9 B D L U K C B E P T R M F N P J H I G O G Q T S...
Страница 49: ...ENGINE 3 7 Remove the engine from the frame...
Страница 83: ...ENGINE 3 41 1 Countershaft 2 Driveshaft 2 1 A...
Страница 135: ...6 4 CHASSIS Left Right Left Right Left Right Spacer Clearance...
Страница 157: ...6 26 CHASSIS Left Right Except E 03 28 Spacer Left Right Right Left Clearance...
Страница 236: ...8 12 SERVICING INFORMATION WIRE HARNESS CABLE AND HOSE ROUTING WIRE ROUTING...
Страница 239: ...SERVICING INFORMATION 8 15 FUEL HOSE AND FUEL TANK MOUNTING...
Страница 242: ...8 18 SERVICING INFORMATION FRONT BRAKE HOSE ROUTING REAR BRAKE HOSE ROUTING...
Страница 333: ...Prepared by 3rd Ed February 2002 1st Ed December 1999 Part No 99500 43022 01E Printed in Japan 336...
Страница 334: ...Printed in Japan Y K1 K2 TK...