Chapter 2: Server Installation
2-5
Figure 2-2. Installing Chassis Rails
Installing the Chassis Rails
Position the fixed chassis rail sections you just removed along the side
of the 6024H-8R/6024H-i making sure the screw holes line up. Note
that these two rails are left/right specific. Screw the rail securely to the
side of the chassis (see Figure 2-2). Repeat this procedure for the other
rail on the other side of the chassis. You will also need to attach the rail
brackets when installng into a telco rack.
Locking Tabs:
As mentioned, both chassis rails have a locking tab, which
serves two functions. The first is to lock the server into place when installed and
pushed fully into the rack, which is its normal position. Secondly, these tabs
also lock the server in place when fully extended from the rack. This prevents
the server from coming completely out of the rack when you pull it out for
servicing.
Содержание SuperServer 6024H-8R
Страница 1: ...SUPERSERVER 6024H 8R SUPERSERVER 6024H i USER SMANUAL 1 0 SUPER NIC 1 NIC 2...
Страница 5: ...v Preface Notes...
Страница 10: ...Notes x SUPERSERVER 6024H 8R 6024H i Manual...
Страница 25: ...Chapter 2 Server Installation 2 9 Figure 2 5 Accessing the Inside of the System P4D P6 UP ER S...
Страница 30: ...SUPERSERVER 6024H 8R 6024H i User s Manual 3 4 Notes...
Страница 58: ...5 24 SUPERSERVER 6024H 8R 6024H i Manual Notes...
Страница 94: ...7 24 SUPERSERVER 6024H 8R 6024H i Manual Notes...
Страница 100: ...A 6 SUPERSERVER 6024H 8R 6024H i Manual Notes...
Страница 124: ...C 4 SUPERSERVER 6024H 8R 6024H i Manual Notes...