background image

10 Operation of LCD Display 

 

User Manual 

76  

 

10.10.4  Reactive Power Setting for Italy 

If the “Countries” selected is “IT” (Italy), several LCD menus and operation methods 
are different from other countries.   

The differences focus on “Run-param” as shown below. 

Italy “Q(P)” Mode 

Power factor changes with the output power of the 
inverter. 
 
Select  Q(P)  mode  and 

Press 

 

to enter into the 

“Run-para-Q(P)” sub-menu. 
 

Press 

 to move the cursor; 

Press 

 to enter the 

editing mode, then the selected parameter will be 
shaded. 

Press

 

 to increase one-step value; 

Press

 

 

to 

decrease one-step value. 

Press

 ENTER

 to confirm the setting and exit from the 

editing mode. 

 

Tab. 10-8

 

Italy “Q(P)” Mode Parameters Explanation 

Parameter 

Explanation

Default

Range

Step

PA* 

Active power at point A (in %)

20% 20~100% 

1% 

PB* 

Active power at point B (in %)

50% 20~100% 

1% 

PC* 

Active power at point C (in %)

100% 20~100% 

1% 

Pf max 

Power factor at point C 

0.9 

0.9~1 

0.01 

Uin** 

Enter Q(P) regulation mode 
when grid voltage is above 
Uin 

105% 100~110% 

1% 

Uout** 

Exit from the Q(P) regulation 
mode when grid voltage is 
below Uout 

100% 90~100% 

1% 

*PA < PB

  PC        ** Uin

Uout 

Содержание SG60KTL

Страница 1: ...SG60KTL V142 UEN Ver11 201712 Version 1 1 User Manual SG60KTL PV Grid connected Inverter ...

Страница 2: ......

Страница 3: ...anufacturer Target Group This manual is for technical personnel who is responsible for inverter installation operation and maintenance and inverter owner who will perform daily LCD operation How to Use This Manual Read the manual and other related documents before any work on the inverter Documents must be stored carefully and available at all times All rights reserved including the pictures marki...

Страница 4: ...ded will result in death or serious injury WARNING indicates a hazard with a medium level of risk which if not avoided could result in death or serious injury CAUTION indicates a hazard with a low level of risk which if not avoided could result in minor or moderate injury NOTICE indicates a situation which if not avoided could result in equipment or property damage NOTE indicates additional inform...

Страница 5: ...III Symbols on the Inverter Body ...

Страница 6: ...ion 10 2 3 3 Derating 11 3 Installation Flow 14 4 Unpacking and Storage 16 4 1 Unpacking and Inspection 16 4 2 Identifying Inverter 16 4 3 Scope of Delivery 18 4 4 Inverter Storage 18 5 Mechanical Installation 20 5 1 Installation Site Selection 20 5 2 Moving Inverter to Installation Site 22 5 3 Installing the Inverter 23 5 3 1 Installing to Metal Frame 24 5 3 2 Installing to Concrete Wall 25 6 Ele...

Страница 7: ...spection before Commissioning 46 7 2 Commissioning Procedure 46 8 Disconnecting Dismantling and Disposing the Inverter 50 8 1 Disconnecting the Inverter 50 8 2 Dismantling the Inverter 50 8 3 Disposal of the Inverter 51 9 Troubleshooting and Maintenance 52 9 1 Troubleshooting 52 9 1 1 Troubleshooting of LED Indicator 52 9 1 2 Troubleshooting of Faults in LCD Screen 52 9 2 Maintenance 56 9 2 1 Rout...

Страница 8: ...rameter Setting 71 10 10 1 Main Screen of Run param 71 10 10 2 Active Reactive Power Parameters 72 10 10 3 Reactive Power Regulation 73 10 10 4 Reactive Power Setting for Italy 76 10 10 5 Save P Q set 78 10 10 6 Time Parameters 78 10 10 7 Derating Parameters 79 10 10 8 ISO Parameters 79 10 10 9 LVRT Parameter 79 10 10 10 HVRT Parameter 80 10 11 Protection Parameter Setting 80 10 11 1 Country Setti...

Страница 9: ...VII 10 13 1 10min Max V 84 10 13 2 Grid Unbalance 85 11 Appendix 86 11 1 Technical Data 86 11 2 Exclusion of Liability 87 11 3 About Us 88 11 4 Contact Information 88 ...

Страница 10: ......

Страница 11: ... work related safety warnings and notes will be specified at the critical points in corresponding chapter All installations should be performed by technical personnel They have received professional training read through this manual and understood all related safety instructions been familiar with electric system related safety instructions Technical personnel mentioned above may perform the follo...

Страница 12: ...formance loss due to bad ventilation The equipment requires good quality ventilation during operation Keep the unit upright and nothing covering the heatsink During Electrical Lethal voltage exists PV arrays will produce electrical energy when exposed to sunlight and thus can create potential electrical shock hazards All cables must be firmly attached undamaged properly insulated and adequately di...

Страница 13: ...ied personnel Improper handling of the accidents occurred may lead to more serious fault or accident Plug and unplug the DC side HV fuse when it is alive Touch the end of the cables that has no insulating treatment and may still be alive Touch the connection copper bus bar terminal or other spare parts inside the device that may be alive The power cable connection is loose Spare parts like the bol...

Страница 14: ...nutes until the inner capacitors are discharged completely Verify using proper testing device to make sure there is no voltage or current Keep unrelated person away A temporary warning sign and barrier must be posted to keep non related person away during electrical connection and maintenance Restart the inverter only when the fault that may impair the inverter safety functions is removed Inverter...

Страница 15: ... instructions warning labels nameplate on the inverter Must be clearly visible Should not be removed or covered Respect the following regulations Grid connection regulations Safety instructions related to PV arrays Safety instructions related to other electrical devices Certain parameter setting country selection etc on the LCD display must only be done by professional persons Incorrect country se...

Страница 16: ...s whose positive and negative terminals need to be grounded Do not connect any local load between the inverter and the AC circuit breaker Inverter is applicable only to the grid connected PV system in Industrial area Any other usage is strictly forbidden Fig 2 1 Inverter application in PV power system Item Description Note A PV strings Monocrystalline silicon polycrystalline silicon and thin film ...

Страница 17: ...the neutral cable to the inverter More than one inverter can be connected to the system if the capacity of the PV system exceeds the capacity of a single inverter Connect proper PV input for each inverter at the input side and connect the output side to the grid 2 2 Product Introduction 2 2 1 Appearance Fig 2 2 Appearance ...

Страница 18: ...ter 4 PE second terminal Specified in EN 50178 user can connect this terminal as per requirements 5 Air outlet Controlled forced air cooling method Ensure well ventilation 6 Hanger Hang the inverter to the backplate 7 Fans 3 fans used for inverter forced cooling 8 DC switch Protective components to safely disconnect DC side current 2 2 2 Dimensions Fig 2 3 Dimensions of the inverter in mm 2 2 3 LC...

Страница 19: ...D indicators LED state Description RUN ON Inverter is running FAULT OFF RUN OFF A fault occurs or protection function is enabled FAULT ON RUN OFF Inverter does not operate or communication fault occurs between the DSP and LCD display FAULT OFF RUN Flicker Warning information occurs to the inverter FAULT OFF 2 2 4 DC Switch DC switch is used to disconnect the DC current safely whenever necessary In...

Страница 20: ...C power to the utility grid through the AC terminal The protection circuit is equipped to ensure the device safe operation and personal safety DC switch is used to disconnect the DC current safely inverter provides standard RS485 ports for communication User can check running data and set related parameter through the LCD display Fig 2 5 Circuit diagram of SG60KTL 2 3 2 Function Description Invers...

Страница 21: ...ion DC injection of AC output current surveillance Anti islanding protection Ambient temperature monitoring DC over voltage protection Over current protection Power module over temperature protection 2 3 3 Derating Output derating is a way to protect the inverter form overload or potential faults Situations require inverter power derating are Internal temperature is too high including ambient temp...

Страница 22: ...r will derate power output until the temperature drops within the permissible range Lower limit of the over temperature derating 75 of the nominal power If the module temperature and internal temperature reach to power derating conditions inverter will derate the power output according to the lower temperature between the two Grid Under voltage Derating When grid voltage is low inverter will derat...

Страница 23: ...User Manual 2 Product Description 13 P Vmin 266V Pn Vgrid 230V Fig 2 6 Grid under voltage derating ...

Страница 24: ...14 3 Installation Flow Fig 3 1 shows the installation flow of the inverter and Tab 3 1 gives the detailed explanation Fig 3 1 Installation flow ...

Страница 25: ...t is not to be installed immediately 4 4 4 Select optimal installation site 5 1 5 Move the inverter to the installation site 5 2 6 Install the inverter to the selected installation site 5 3 7 Electrical connection DC side connection AC side connection Ground connection Communication connection 6 3 6 7 8 Inspection before commissioning 7 1 9 Start up the inverter and configure corresponding paramet...

Страница 26: ...ing to the packing list Check the inner contents for damage after unpacking If any damage is found please contact Sungrow or the forwarding company Do not disposal of the original packaging It is best to store the inverter in its original packaging Fig 4 1 Inverter paper packaging 4 2 Identifying Inverter The nameplate is attached to one side of the inverter and the packaging carton respectively I...

Страница 27: ...echnical data 3 Marks of certification institutions 4 Company name website and origin Tab 4 1 Description of icons on the nameplate icon Description Do not dispose of the inverter with household garbage Refer to corresponding instructions TUV mark of conformity The inverter is in compliance with directives of TUV CE mark of conformity The inverter is in compliance with directives of CE ...

Страница 28: ...d matches it replace the original AC cable gland on the bottom of the device before wiring 4 4 Inverter Storage Store the inverter properly when the inverter is not to be installed immediately Sungrow shall hold no liability for the corrosion of the device or the failure of device internal components caused by storage of the device not following the requirements specified in this manual Inverter m...

Страница 29: ...commended six months check for any visible damages during the storage period Replace the packing in time if necessary The packing should be upright If the inverter is stored for half a year or longer time local installer or service dept of Sungrow should perform a comprehensive test before connecting the inverter into PV power system ...

Страница 30: ...he load capacity of the wall into account The wall concrete wall or metal frame should be strong enough for the weight of the inverter over a long period Install the inverter where is convenient for electrical connection operation and maintenance Do not install the inverter on the wall made up of flammable materials Do not install the inverter near flammable materials or gas ...

Страница 31: ...ation With an IP65 protection rating the inverter can be installed both outdoors and indoors The ambient temperature should be within 25 C to 60 C Inverter will operate with power derating if temperature is too high The relative humidity range of the installation site is 0 100 Do not expose the inverter to direct sunlight or rain or snow Shaded installation site is preferred ...

Страница 32: ...verter where children cannot reach Do not install the inverter near residential area Noise can be produced during inverter operation which may affect the daily life 5 2 Moving Inverter to Installation Site To install the inverter remove the inverter from the packaging and move it to the installation site Follow the instructions below during inverter moving Always keep in mind the weight of the inv...

Страница 33: ...ng If you do not use the supplied backplate you can drill holes as per specifications below 32 2 M4X7 440 524 544 514 3 26X11 Fig 5 1 Dimensions of the backplate figures in mm The stainless fasteners are supplied for attaching the backplate to metal frame Fig 5 2 Dimensions of fastener for metal frame figures in mm To install the inverter to concrete walls user needs to purchase expansion bolts wi...

Страница 34: ... frame does not match the backplate re drill holes on the backplate according to the metal frame chooden Step 5 Secure the backplate to the metal frame firmly by the supplied fastener Torque of the fasten nut is 35 N m Step 6 Install the inverter cap Step 7 Lift the inverter above the backplate and then slide down to make sure they match perfectly Step 8 After putting the inverter on the backplate...

Страница 35: ...p 2 Place the backplate to the chosen concrete wall and adjust it to proper position and height Step 3 Mark the position for holes drilling according to the holes position of the backplate Step 4 Drill holes according to the marks make before Check to ensure that there is no other electronic or plumbing installation inside the wall before drilling holes ...

Страница 36: ...bolt sets Torque of the fasten nut is 35 N m Step 6 Install the inverter cap Step 7 Lift the inverter above the backplate and then slide down to make sure they match perfectly Step 8 After putting the inverter on the backplate secure the inverter to the backplate with two M4 16 screws fix screw hole has its own nut ...

Страница 37: ...nnection may lead to fetal personal injury or device permanent damages Cable connection can be done only by professional personnel Always keep in mind that the inverter is dual power supplied Electrical operators must wear proper personal protective equipment helmet insulated footwear and glove etc 6 1 Terminal Description Inverter electrical connection terminals and cable entries are all at the i...

Страница 38: ...ion 6 2 1 AC side requirements Connection to the utility grid must be done only after receiving approval from the local company Before grid connection verify to make sure the gird voltage and frequency meet the requirements of the inverter Contact the local grid company for solution if otherwise For detailed parameter please refer to 11 1 Technical Data AC Circuit Breaker An independent three or f...

Страница 39: ...ch should be triggered when the fault current is 600mA or higher Multiple Inverters in parallel Connection The following different requirements must be respected if several inverters are in parallel connection to the grid Scenario 1 Several inverters are in parallel connection to the 3 phase low voltage grid Requirements If the number of the grid connected inverters exceed 40 please contact Sungro...

Страница 40: ...d voltage of installation site A transformer with a tap changer on the high voltage side is recommended in order to remain consistent with the grid voltage At an ambient temperature of 25 transformers should withstand 110 of total load rating Transformer with a short circuit impedance less than 6 is recommended For thermal rating the load curve of the transformer and the ambient conditions at the ...

Страница 41: ...he following factors Grid impedance corresponds to the specifications below to avoid accidental short circuit or output power derating Considering the voltage drop and other conditions please enlarge the cable dimension Power loss of the cable should be less than 1 of the nominal power Withstand ambient temperature Cable layout inside wall underground free air etc UV resistance and so on Connectin...

Страница 42: ...e inverter from the grid due to high impedance of the cable No Description Remark A Protective layer External diameter of the cable 30 5 50 mm B Length of insulation to be stripped off 24 mm C Insulation layer D Cross section of AC cables Range 25 150mm2 recommended value 50 mm2 The external diameter of the AC cable described in A is proper range If you select AC cable with the external diameter w...

Страница 43: ... AC cable gland itself needs to be replaced other accessories packing nuts can still be used Step 5 Fix the AC cable to the corresponding terminals with torque shown in the follow two tables Tab 6 1 Screw tightening torque Cable section mm2 Screw tightening torque N m Min Max 26 7 42 3 9 8 13 6 53 5 67 4 11 9 16 3 70 107 15 8 22 6 127 177 19 8 29 4 The table values are to used for the following ca...

Страница 44: ...le to the corresponding terminals Observe the AC terminal layout Device will not work normally if the phase cable is connected to the PE terminal Do not squeeze or press the cable insulation layer Improper connection may affect the normal operation of the inverter Step 7 Screw the cap nut to the cable Step 8 Seal the gaps between the AC cable and the gland inside the lower part of the cabinet by f...

Страница 45: ...ghts The inverter internal cable connection cabinet does not equip any positive or negative fuse During system design you can follow the local regulations to configure or not configure the external fuse to the positive and negative cables of the string Make sure the voltage of each PV array is less than 1000V at all times Irrevocable damage may follow if otherwise Make sure the max short circuit c...

Страница 46: ... example Item Parameter PV cell type YL250P 29b Power 250W Open circuit voltage STC 37 6V Short circuit current STC 8 92A Open circuit voltage temperature coefficient β 0 32 C No of PV cells in a PV string 23 Under the STC condition where ambient temperature is 25 C the open circuit voltage of PV cells is 37 6V 23 864 8V 1000V Supposed that the lowest temperature is 25 C the open circuit voltage o...

Страница 47: ...ted to the inverter are voltage free before electrical connection Do not connect the AC circuit breaker before electrical connection is completed Step 1 Peal the cable The DC cables can be Hard line flexible wires For flexible cables stranded wires use cold pressing terminal lugs Step 2 Fix the DC cable to the corresponding terminals with torque shown in the Tab 6 1 Screw tightening torque and Tab...

Страница 48: ... such as the PV array frame and inverter enclosure When there is only one inverter in the PV system ground the PE cable When there are multiple inverters in the PV system they can be multi point grounded Connect PE cables of all inverters and the mounting metal frames of PV array to the equipotential cable according to the on site situation to realize equipotential connection Fig 6 2 Grounding of ...

Страница 49: ... within the scope of delivery 6 5 Communication Connection 6 5 1 Communication Overview There are two communication waterproof connection terminal on the bottom of the inverter RS485 A B terminals and RS485 interface are provided on the configuration circuit board of the junction box A 120Ω terminating resistor can be connected between the A and B communication cable through the dip switch Item Na...

Страница 50: ...communication cable and RJ45 plug before communication connection RS485 communication cables should be Shielded twisted pair cables or Shielded twisted pair Ethernet cable A converter such as RS485 232 converter or SolarInfo Logger is needed to convert signal between inverter and PC Network interface is an optional function Contact Sungrow if necessary 6 5 2 RS485 Communication System For Single I...

Страница 51: ... of 120Ω The shielding layer of RS485 cable should be single point grounded The length of RS485 communication cable should be less than 1200m If several inverters communicate with each other and connect to the SolarInfo Logger at most 4 daisy chains are supported and 60 devices in total can be connected i e 4 daisy chains can be connected with at most 15 devices connected to one chain or 3 daisy c...

Страница 52: ...nverte r Communication connection RS485 bus connection or RS485 RJ45 connection Terminating Resistor RS485 bus RJ45 n 15 n 15 Inverter 1 Only out Only out No Yes Inverter 2 n 1 In and Out In and Out No Inverter n In and Out In and Out No Yes ...

Страница 53: ...ction switch ON or OFF the terminating resistor Step 6 Tighten the tread lock sealing lock Block off the vacant terminals to protect the dust and moisture penetrating inside the inverter Step 7 Seal the gaps between the cable and the gland inside the lower part of the cabinet by fireproofing mud If there is no other connection procedure reassemble and fix the front cover of the connection cabinet ...

Страница 54: ... inverter s internal from dust and moisture Step 7 According to the position of the inverter refer to the prior section switch ON or OFF the terminating resistor Step 8 Seal the gaps between the cable and the gland inside the lower part of the cabinet by fireproofing mud If there is no other connection procedure reassemble and fix the front cover of the connection cabinet Step 9 For the wires whic...

Страница 55: ...User Manual 6 Electrical Connection 45 SolarInfo logger and RS485 232 converter are optional parts and can be ordered from Sungrow ...

Страница 56: ... Cables are routed in safe place or protected against mechanical damage 7 Specification of AC circuit breaker is reasonable 8 Terminals not used underneath the inverter are sealed 9 Warning signs labels are suitably affixed and durable 7 2 Commissioning Procedure If all checking items mentioned above meet the requirements precede as follows to start up the inverter for the first time Step 1 Close ...

Страница 57: ...ter is installed where the country code is not included please choose item Other and manually set the protection parameters If the country code is not set correctly during commissioning reset the protection parameters as dictated in 10 11 Protection Parameter Setting There may be faults if otherwise Step 6 If the country code set as GR a Grid codes page as shown in the right will appear Press to s...

Страница 58: ...rm If the country code set as TH a Grid codes page special for Thailand will appear Press to select grid code and press ENTER to confirm If the country code set as Other a Grid codes page as shown in the right will appear Press to select grid code and press ENTER to confirm If the country selected is not the abvementioned 5 countries enter the next step directly Step 7 After selecting the Grid Cod...

Страница 59: ...k whether all above mentioned parameters are correct Confirm by Pressing ENTER Cancel by Pressing ESC and reset Step 10Inverter will enter into startup process Observe the status of LED indicators and the LCD main screen If commissioning succeeds the RUN indicator will be on and Run will be displayed on the State area If commissioning fails the FAULT indicator will be on and Fault will occur on th...

Страница 60: ... Please strictly follow the above sequence Inverter will not work normally if otherwise Step 3 Wait about ten minutes until the capacitors inside the inverter have been discharged Step 4 Loose the six screws on the lower connection cabinet and then remove the lid Step 5 Measure AC voltage to ground at the AC terminal to confirm AC output voltage of inverter at the AC circuit breaker is zero Step 6...

Страница 61: ...the Inverter Users should take the responsibility for the disposal of the inverter Some parts and devices in the inverter such as the LCD display batteries modules and other components may cause environment pollution Users must comply with the related local regulations to avoid pollution ...

Страница 62: ...orm troubleshooting according to fault type in LCD screen If fault cannot be solved please contact Sungrow RUN indicator is blinking Warning fault occurs of the inverter Perform troubleshooting according to fault type in LCD screen If fault cannot be solved please contact Sungrow 9 1 2 Troubleshooting of Faults in LCD Screen When faults occur Fault state will be shown on the main screen Press to v...

Страница 63: ...he fault still exists please contact Sungrow 007 Transient AC overcurrent The inverter will self recover after several seconds 008 The grid frequency exceeds inverter allowable upper limit Check the grid frequency If the grid voltage exceeds the inverter permissible range ask utility grid company for solution If the grid voltage is within the permissible range contact Sungrow 009 The grid frequenc...

Страница 64: ... and connection 023 PV configuration mode has changed during inverter running Check the PV configuration Restart the inverter 024 Neutral point deviation is detected Inverter resumes normal operation when deviation is within the permissible range If the fault occurs repeatedly contact Sungrow 025 Transient unbalance of voltage neutral point Inverter resumes normal operation when deviation is withi...

Страница 65: ...ngs For more detailed information please refer to 6 3 PV Array Connection 048 Phase R current sampling channel fault Wait for inverter recovery If the fault occurs repeatedly contact Sungrow 049 Phase S current sampling channel fault 050 Phase T current sampling channel fault 051 Hardware Overvoltage Overcurrent protection Wait for inverter recovery If the fault occurs repeatedly contact Sungrow 0...

Страница 66: ...overed If the PV strings are clean and uncovered check the PV module for failure Check the DC input cable for disconnection If so reconnect the cable and reset the PVS function If the warning still occurs contact Sungrow 9 2 Maintenance 9 2 1 Routine Maintenance Item Method Period System clean Check the temperature and dust of the inverter Clean the inverter enclosure if necessary Check if the air...

Страница 67: ...fore maintenance Lethal voltage still exists in the inverter Please wait for at least ten minutes and then perform maintenance work Only qualified electricians can maintain the fans Step 1 Disconnect the AC circuit breaker Step 2 Turn off the upstream DC circuit break Rotate DC switch to the OFF position Step 3 Wait for at least ten minutes Step 4 Disconnect all electrical connection in the revers...

Страница 68: ...ated in the process of running the inverter The inverter adopts a controlled forced air cooling method In order to maintain good ventilation please check to make sure the air inlet and outlet are not blocked Clean the air inlet and outlet with soft brush or vacuum cleaner if necessary 9 3 Contact Sungrow Service Should you have any problems in operating on the inverter please contact us Service ho...

Страница 69: ...User Manual 9 Troubleshooting and Maintenance 59 Serial number of the inverter Fault code name Brief description of the problem ...

Страница 70: ...ards or downwards or scroll among set values Hereinafter it is referred to as Press Press for more than two seconds Return to the previous menu or cancel the command Hereinafter it is referred to as Press ESC Press for less than 2 seconds Move left or right or turn pages Hereinafter it is referred to as Press Press for more than two seconds Enter into the sub menu or confirm the command Hereinafte...

Страница 71: ...User Manual 10 Operation of LCD Display 61 10 2 Menu Tree Fig 10 1 Menu tree ...

Страница 72: ...is stopped Key stop Inverter will stop operation by manual stop through LCD menu In this way inverter internal DSP stops To restart the inverter manually start from the LCD menu Start The inverter is initializing and synchronizing with the grid Upd fail IAP upgrade failure Fault If a fault occurs inverter will automatically stop operation disconnect the AC relay and display the fault information o...

Страница 73: ...Contrast Adjustment Step 1 Press ESC to enter into the contrast adjustment screen Step 2 Press to increase the setting value and press to decrease the value Step 3 Press ENTER to confirm the contrast setting Contrast adjustment range 0 100 Recommended value 50 or 60 10 5 Checking Running Information The main screen displays some basic information about the inverter For more detailed information pl...

Страница 74: ...ion due to the inverter E month The energy generated in this month h Total Total running hours of the inverter T today Inverter running time today Temp Internal temperature of the inverter ISO Insulation resistance to the ground of the input side P W Inverter output active power S Va Inverter output apparent power Country Inverter selected country code Grid code Inverter selected grid code note if...

Страница 75: ... and press to select the date you want to view Confirm by pressing ENTER LCD display shows the running records Press to turn pages and press to view the records of the selected date 10 6 2 Checking Fault Records Main Screen Press ENTER Menu Press Press ENTER His inform Press ENTER Flt record Press ENTER On the Flt record interface scroll pages forwards by pressing and press to scroll pages backwar...

Страница 76: ...cords 10 6 4 Checking Energy Records Main Screen Press ENTER Menu Press Press ENTER His inform Press Press ENTER Energy record Press ENTER LCD display shows the energy records User can view various energy records by pressing power curve daily energy histogram daily energy histogram monthly energy histogram and annual energy histogram Power curve shows the power output from 5am to 11pm in a single ...

Страница 77: ...togram shows the power output every month in a year Press or to view the monthly energy of the latest 15 years Annual energy histogram shows the power output every year Press or to view the annual energy of the latest 90 years 10 7 Starting Stopping Main Screen Press ENTER Menu Press 2 Start Stop Press ENTER Press to choose Start Stop and press ENTER to confirm the choice Press ENTER to confirm ...

Страница 78: ...ve cursor right and Press to input the password 111111 Step 4 Press ENTER to confirm the password and enter the Set param sub menu 10 9 System Parameter Setting There are various user settable system parameters You can set the system parameters after entering the correct password 10 9 1 Language Setting Main Screen Press ENTER Menu Press 3 Set param Press ENTER Enter password Press ENTER Sys param...

Страница 79: ...accuracy requirement of the inverter internal clock time calibration can be performed everyday through the upper computer or other channel communicated with the device For details please refer to the time calibration description in the inverter communication protocol Please contact Sungrow if there is still time deviation after calibration 10 9 3 Total Energy Deviation Adjustment If the accumulati...

Страница 80: ... to the default value except the protective parameters and time once the load default operation is performed Main Screen Press ENTER Menu Press 3 Set param Press ENTER Enter password Press ENTER Sys param Press ENTER Press 3 Load default Press ENTER Press ENTER to confirm load default 10 9 5 Checking Firmware Version Main Screen Press ENTER Menu Press 3 Set param Press ENTER Enter password Press E...

Страница 81: ...ctive power change rate When it is set to ON user can set the raise and decline rate OFF OFF ON Power raise When Rate limit is ON set the active power rise rate 100 min 8 100 min Power Decline When Rate limit is ON set the active power decline rate 6000 min 8 6000 min Fault slowup Set the power rise rate when a fault is removed When it is ON the active power raise rate can be set ON OFF ON Slowup ...

Страница 82: ...connect to the grid when resistance to the ground is below the set value ON OFF ON ISO pro value Set the resistance to the ground 30KΩ 20 3000KΩ LVRT param Set the LVRT to OFF or ON When it is ON inverter can keep grid connection for a certain time when grid fault occurs and provide reactive power for grid recovery OFF ON HVRT param Set the HVRT to OFF or ON When it is ON inverter can keep grid co...

Страница 83: ...nation Pf The reactive power can be regulated by the parameter PF Power Factor Qt The reactive power can be regulated by the parameter Q Var limits in Off The PF is limited to 1 000 and the Q Var limits is limited to 0 0 Q P The PF changes with the output power of the inverter Q U The reactive power changes with the grid voltage Pf Mode The reactive power can be regulated by the parameter PF on th...

Страница 84: ...o set the appropriate value Confirm settings by Press ENTER Tab 10 6 Q P Mode Parameters Explanation Parameter Explanation Default Range Upper PF Cap Power factor of point P1 in the Q P mode curve 1 0 9 1 Lower Power Output power of point P1 in the Q P mode curve in 50 0 50 Lower PF Ind Power factor of point P2 in the Q P mode curve 0 9 0 9 1 Upper Power Output power of point P2 in the Q P mode cu...

Страница 85: ...ation Default Range Lower Q Sn Ind Inductive Q Sn value of point P4 in the Q U mode curve 25 0 50 Upper Q Sn Cap Capacitive Q Sn value of point P1 in the Q U mode curve 25 0 50 Lower U Limit Grid voltage limit in of point P1 in the Q U mode curve 80 80 90 Upper U Limit Grid voltage limit in of point P4 in the Q U mode curve 115 110 115 U1 Limit Grid voltage limit in of point P2 in the Q U mode cur...

Страница 86: ...the editing mode then the selected parameter will be shaded Press to increase one step value Press to decrease one step value Press ENTER to confirm the setting and exit from the editing mode Tab 10 8 Italy Q P Mode Parameters Explanation Parameter Explanation Default Range Step PA Active power at point A in 20 20 100 1 PB Active power at point B in 50 20 100 1 PC Active power at point C in 100 20...

Страница 87: ...o decrease one step value Press ENTER to confirm the setting and exit from the editing mode Tab 10 9 Italy Q U Mode Parameters Explanation Para meter Explanation Default Range Step V2i Grid voltage at point D in 90 90 110 1 V1i Grid voltage at point C in 92 90 110 1 V2s Grid voltage at point A in 108 90 110 1 V1s Grid voltage at point B in 110 90 110 1 Qmax The max ratio of reactive power in 90 50...

Страница 88: ...t screen Press to move arrow to one item Press to move cursor and Press to set Confirm by Pressing ENTER Select ON to save the values set after power down Select OFF to restore default values ater power down 10 10 6 Time Parameters Main Screen Press ENTER Menu Press 3 Set param Press ENTER Enter password Press ENTER Press Run param Press ENTER Press Time param Press ENTER ...

Страница 89: ...ss ENTER Press 2 Derating param Press ENTER 10 10 8 ISO Parameters Main Screen Press ENTER Menu Press 3 Set param Press ENTER Enter password Press ENTER Press Run param Press ENTER Press 3 ISO param Press ENTER 10 10 9 LVRT Parameter Main Screen Press ENTER Menu Press 3 Set param Press ENTER Enter password Press ENTER Press Run param Press ENTER Press 4 LVRT param Press ENTER ...

Страница 90: ... input the password 10 11 1 Country Setting To make the protection parameters setting convenient inverter provides in built protection parameters for certain countries Press to choose countries and press ENTER to confirm If the country selected is not in the list please choose Other and then input the protection parameters manually This running parameter is optional You can purchase the device equ...

Страница 91: ...nglish GR Greece English NL Netherlands English PT Portugal English CN China Chinese SE Sweden English RO Romania English TH Thailand English TK Turkey English AE United Arab Emirates English IR Israel English HN Hungary English ZF The Republic of South Africa English Other Country not mentioned above English When the country selected is TH TK DE GR or Other the grid code specific to them will app...

Страница 92: ...ENTER 10 11 3 Multi stage Protection Parameter Setting The following interfaces will appear if Multi stage is selected Press to select parameter Press to move cursor and Press to set the appropriate value Confirm settings by Pressing ENTER Tab 10 11 Multi stage Protection Parameters Explanation Parameter Explanation Max V prot Over voltage protection Ⅰ Max V grid Stage Ⅰ Grid over voltage U Ⅰ Max ...

Страница 93: ...F grid Stage Ⅱ Grid under frequency f Ⅱ Min F time Stage Ⅱ Grid under frequency f tripping time 10 11 4 Protection Recovery Setting After setting the protection parameters inverter enters protection recovery interface Tab 10 12 Description of protection recovery parameters Parameter Explanation Vmax recover Max protection recovery voltage Vmin recover Min protection recovery voltage Fmax recover M...

Страница 94: ... 10 13 Advanced Parameters Setting The inverter provides a variety of advanced protection features Main Screen Press ENTER Menu Press 3 Set param Press ENTER Enter password Press ENTER Press 4 Advanced settings Press ENTER 10 13 1 10min Max V Main Screen Press ENTER Menu Press 3 Set param Press ENTER Enter password Press ENTER Press 4 Advanced settings Press ENTER 10min Max V Press ENTER User can ...

Страница 95: ...nbalance Main Screen Press ENTER Menu Press 3 Set param Press ENTER Enter password Press ENTER Press 4 Advanced settings Press ENTER Press 1 Grid Unbalance Press ENTER Press to select and set the grid voltage unbalance protection point Confirm the selection by Pressing ENTER This protection function is optional You can purchase the device equipped with this optional function For details please con...

Страница 96: ...rter backfeed current to the array 0A Output Side Data Nominal AC output power 60000W Max AC output apparent power 66000VA Max AC output power 66000W Max AC output current 96A Nominal AC voltage 3P N PE 3P PE 230 400Vac AC voltage range 310 480Vac AC connected Inrush current Peak Duration 70A 0 05ms Maximum output fault current 102A Maximum output overcurrent protection 220A Nominal grid frequency...

Страница 97: ...raphic LCD Communication RS485 DC terminal Screw crimp terminal AC terminal Screw crimp terminal Certification VDE0126 1 1 EN62109 1 EN62109 2 G59 3 CEI 021 AS NZS 3100 AS4777 2 AS4777 3 VDE AR N 4105 BDEW CGC Mechanical Data Dimensions W H D 634 959 267mm Mounting method Wall bracket Weight 60kg 11 2 Exclusion of Liability The content of these documents is periodically checked and revised where n...

Страница 98: ...is also applies to the provision or non provision of support activities SolarInfo software used for commercial purposes is prohibited Decompiling decoding or destroying the original program including SolarInfo software and the embedded software is prohibited 11 3 About Us Sungrow power supply is a Chinese leading manufacturer of various power electronics products for renewable energy generation sy...

Страница 99: ...ou Rd New High Technology Industrial Development Zone Hefei P R China Zip 230088 Sales tel 0551 65327834 65327845 Fax 0551 65327856 Website www sungrowpower com Email sales sungrowpower com sales support sungrowpower com technical support service sungrowpower com after sales service ...

Страница 100: ...dvance notice Sungrow Power Supply Co Ltd Add No 1699 Xiyou Rd New High Technology Industrial Development Zone 230088 Hefei P R China Post Zip 230088 Web www sungrowpower com E mail info sungrow cn Tel 86 551 6532 7834 6532 7845 Fax 86 551 6532 7856 ...

Отзывы: