7 Commissioning
49
Step 8
Set the inverter time as per local time.
Incorrect time setting will affect the data
logging.
Press
to move the cursor and
Press
to set the specific time and date.
Press
ENTER
to confirm setting.
Step 9
After configuring all parameters, there will be
a “setting confirmation” screen. Check whether
all above-mentioned parameters are correct.
Confirm by
Pressing
ENTER
. Cancel by
Pressing
ESC
and reset.
Step 10
Inverter will enter into startup process.
Observe the status of LED indicators and the
LCD main screen. If commissioning succeeds,
the “RUN” indicator will be on and “Run” will be
displayed on the “State” area.
If commissioning fails, the “FAULT” indicator will be on and “Fault” will occur on the
display.
Press
to view “current fault” information. Remove the existing fault and
then repeat the commissioning procedures.
Содержание SG60KTL
Страница 1: ...SG60KTL V142 UEN Ver11 201712 Version 1 1 User Manual SG60KTL PV Grid connected Inverter ...
Страница 2: ......
Страница 5: ...III Symbols on the Inverter Body ...
Страница 10: ......
Страница 23: ...User Manual 2 Product Description 13 P Vmin 266V Pn Vgrid 230V Fig 2 6 Grid under voltage derating ...
Страница 71: ...User Manual 10 Operation of LCD Display 61 10 2 Menu Tree Fig 10 1 Menu tree ...