Chapter 2
Hardware Installation
2-13
3. Remove the slot filler panel from the selected node blade server slot, if
necessary.
4. Get the RTM from the shipping kit.
5. Perform any card-specific hardware procedures, if necessary.
Refer to the documentation that you received with the card for more information.
6. Prepare the card by opening the injector/ejector latches at the top and bottom of
the card (
FIGURE 2-6
RTM Injector/Ejector Latch and Locking Screw
Locking screw
Injector/ejector latch
Injector/ejector latch
Locking screw
Содержание Netra CP3060
Страница 48: ...2 20 Netra CP3060 Board User s Guide April 2009...
Страница 49: ...Chapter 2 Hardware Installation 2 21...
Страница 79: ...4 22 Netra CP3060 Board User s Guide April 2009...
Страница 107: ...5 28 Netra CP3060 Board User s Guide April 2009...
Страница 129: ...Index 4 Netra CP3060 Board User s Guide April 2009...