Chapter 2
Hardware Installation
2-15
FIGURE 2-7
Installing Node Blade Server Into Chassis Slot
6. Taking care to keep the blade server aligned in the guides, slide the blade
server in until the injector/ejector latches engage the card cage.
7. Push the blade server slightly into the midplane connectors, and then close the
latches to seat the blade server in the connectors (
).
When the lower latch is closed, the blue Hot-Swap LED blinks while the blade
server is initializing. The blue LED turns off and the green OK LED lights when
the blade server is ready.
Содержание Netra CP3060
Страница 48: ...2 20 Netra CP3060 Board User s Guide April 2009...
Страница 49: ...Chapter 2 Hardware Installation 2 21...
Страница 79: ...4 22 Netra CP3060 Board User s Guide April 2009...
Страница 107: ...5 28 Netra CP3060 Board User s Guide April 2009...
Страница 129: ...Index 4 Netra CP3060 Board User s Guide April 2009...