1
S
Contents
1. Scope .................................................................................................................................................................... 4
2. Warnings and Cautions ......................................................................................................................................... 5
2.1 Warnings ............................................................................................................................ 5
3. Product Symbol Definition.................................................................................................................................... 6
3.1
EMC Precautions .................................................................................................................. 7
4. Party Responsibilities ........................................................................................................................................... 8
4.1 Hospital Responsibilities ..................................................................................................... 8
4.2 Contractor Responsibilities ................................................................................................. 8
4.3 Stryker Responsibilities ...................................................................................................... 9
5. iSuite Operating Room ....................................................................................................................................... 10
5.1 Documentation Station (Stryker Provided) ......................................................................... 10
5.1.1
Receiving and Assembling the Documentation Station ................................................10
5.1.2
Additional Documentation Station Notes ...................................................................11
5.1.3
Installing the Documentation Station ........................................................................12
5.2 Documentation Station (Hospital Provided) ........................................................................ 16
5.3 Documentation Station Equipment Requirements .............................................................. 16
5.4
iSuite Equipment Integration Notes ................................................................................... 19
5.4.1
Wall Mounted 46" or 55" LCD Monitor or 42" TouchPanel ..............................................19
5.4.2
Wall/Ceiling Mounted Room Status Camera (WRC, CRC)
LA
..........................................19
5.4.3
Wall Plates ...............................................................................................................20
5.4.4
Observation Room Touch Panel, Microphone and Speaker (OBS)
LA
.............................20
5.4.5
Cable Run to Video Network Hub (HRN).......................................................................20
5.4.6
Equipment Boom Cable Kit (Brand) (EQB)....................................................................21
5.4.7
Anesthesia Boom Cable Kit (Brand) (ANB) ...................................................................21
5.4.8
Navigation Arm (NAM) ...............................................................................................21
5.4.9
Stryker Single Flat Panel Arm Cable Kit .......................................................................22
5.4.10 Stryker Dual Flat Panel Arm Cable ...............................................................................22
5.4.11 Single Flat Panel Arm Cable Kit (Non-Stryker Flat Panel Arm) (NAM) ..............................22
5.4.12 Dual Flat Panel Arm Cable Kit (Non-Stryker Flat Panel Arm) .........................................22
6. Infinity Based Conference System (IBC) Rooms
LA
............................................................................................. 23
6.1 SPI3 Customer Supplied Casework (SCW) ............................................................................ 23