![Stryker Operating Room Information System Скачать руководство пользователя страница 27](http://html.mh-extra.com/html/stryker/operating-room-information-system/operating-room-information-system_preinstallation-manual_1385978027.webp)
23
S
6. Infinity Based Conference System (IBC) Rooms
LA
Note
All cabling must be provided and pulled by Hospital/Contractor prior to Stryker's
arrival.
IBC's are most often installed in auditoriums, classrooms, and large conference rooms. The IBC can be
installed in a variety of places. The control system can either sit in a closet or in the back of the room.
A podium is recommend to accommodate the IBC Touch Panel and cable runs to the control system.
6.1 SPI3 Customer Supplied Casework (SCW)
Data
Per listed equipment
Back Box
Per listed equipment
Power
Recommended two (2) - 20 amp circuits:
• One (1) circuit for quad outlet behind video router
• One (1) circuit for quad outlet behind support equipment
Space
Requirements
• Casework must allow for a minimum 2" cable passage between all compo-
nents housed inside.
• Section housing video router must have an interior dimension of at least
27.5"W X 31"H X 29"D.
• Section housing video router must be vented.
• Must allow for direct access to backboxes per requirements listed below.
6.2 IBC Unit with Tower (ICW1)
LA
Dimensions
27.5"W X 65"H X 30"D
Data
One (1) Ethernet connection
Back Box
• One(1) 18"W X 18"H X 4"D (minimum) junction box flush mounted.
• Set bottom of the box 9" above finished floor within the footprint of the tower.
• Terminate all integration conduits to this junction box.
• Hospital/Contractors will provide and pull all cables.
Power
One (1) - 20 AMP circuit for quad outlet behind the tower.
6.3
IBC Unit with Stryker Credenza (ICW2)
LA
Data
One (1) Ethernet connection
Back Box
• One(1) 18"W X 18"H X 4"D (minimum) junction box flush mounted.
• Set bottom of the box 9" above finished floor within the foot print of the tower.
• Terminate all integration conduits to this junction box.
• Hospital/Contractor will provide and pull all cables.
Power
One (1) - 20 amp circuit for quad outlet behind the tower.
Note
Customer/Contractor responsible for receiving and installing Credenza prior to