![Stryker Operating Room Information System Скачать руководство пользователя страница 44](http://html.mh-extra.com/html/stryker/operating-room-information-system/operating-room-information-system_preinstallation-manual_1385978044.webp)
40
S
Conduit
One 2” conduit terminated by All-In-One Viewing system, as converter and cable will
extend from system to external display.
Power
One (1) standard electrical outlet available for external display(s).
Note
All SuiteStatus cabling must be provided and pulled by the Hospital/Contractor
prior to Stryker Installation.