28
www.stryker.com
EN
0703-001-700 Rev-C
8 Instructions
8.1 Before First Use
8.1.1 To Unpack the Rover
WARNINGS:
▪
LIFT HAZARD:
ALWAYS have more than one person
unpack and remove this equipment from the shipping
pallet. See
Section 14 Specifications
for rover weight.
Failure to comply may result in personal injury.
▪ Upon initial receipt, inspect each component for
damage. DO NOT use any equipment if damage is
apparent or the inspection criteria are not met. See
Table 19 Inspection Schedule and Criteria
.
1. Remove the exterior packaging materials from the
rover and recycle the material as required.
2. Using at least two people, remove the rover from the
shipping pallet.
3. Inspect the rover and components for damage. If
damage is apparent, DO NOT use the equipment.
4. Make sure all of the components are provided.
See
Table 13 Components Supplied with Rover
. If
any component is missing, see
Section 1.3 Contact
Information
.
Table 13 – Components Supplied with Rover
COMPONENTS
REF
Symbol Definition Chart
0036-716-000
Fluid Suction HEPA Filter
0702-034-000
Power Cord
0703-001-001
Instructions For Use (IFU)
0703-001-700
Neptune 3 Software License
Addendum
0703-001-701
Docking Station Instructional Poster
9100-003-353
8.1.2 To Add Canister Prefill Fluid
NOTE:
Before the rover may be tested and placed into
use, initial docking is required. Initial docking will add
prefill fluid to the canisters. See
Section 8.4.3 To Dock
the Rover
. Failure to comply will result in prefill errors and
prevent the rover from operating properly. See
Section 17
Glossary
for definition of prefill fluid.
8.1.3 To Test the Rover
8.1.3.1 To Connect Power to the Rover
1. Connect the rover to facility electrical power using
the supplied power cord. Insert the plug of the power
cord through the strain relief hole before connecting
the power cord to the rover (Figure 18). The power
cord plug has a latched release button to prevent
unintended removal from the rover power receptacle.
2. Push the power switch to the ON position.
3. Read the safety information on the control screen, then
touch the CONFIRM button.
Figure 18 – To Connect Power
8.1.3.2 To Test Fluid Suction
NOTES:
▪ A SET UP SYSTEM screen will appear (Figure 19)
after confirmation of the safety information (Figure 11).
A valid manifold must be installed into the manifold
receptacle to enable suction control.
▪ If the manifold is valid and installed correctly, a ‘task
complete’ audible indicator will occur, the manifold
suction indicator will illuminate white or pink, and the
START SUCTION button will be enabled.
0000160552, Rev. C Effective Date: Nov 25, 2015 1:43:15 PM
Print Date: Nov 25, 2015 02:19:13 PM