
67
B58FC1 0000000094 EN 002
OPERATION
(8) If applicable, connect the hydraulic lines of
the implement with the front loader
couplings.
Lower the front loader until the implement
is level on the ground.
Depressurize the hydraulic system.
or
With the implement function actuated,
move the operating lever in the lateral
end positions in order to depressurize the
implement hydraulic system
(see
Connect the hydraulic lines of the
implement to the couplings of the switch
valve for the 3rd control circuit.
(9) For implements from other manufacturers:
carefully swivel the implement to all end
positions, to ensure that the implement does
not collide with the front loader.
The implement is mounted and ready for
operation.
6.5.4
Putting down implements with mechanical implement locking mechanism on skid-steer and
Euro change frames
Putting down the implement:
(1) Position the implement horizontally and
lower the front loader until it is just above the
ground.
Do not lower the front loader all the way to
the ground, otherwise the implement
locking mechanism is blocked.
(2) Switch off the tractor.
Apply the parking brake.
Stop the engine.
Depressurize the hydraulic system.
or
With the implement function actuated,
move the operating lever in the lateral
end positions in order to depressurize the
implement hydraulic system
(see
(3) If necessary, disconnect the hydraulic lines
of the implement from the couplings of the
switch valve for the 3rd control circuit
(see
6.3 Operating the hydraulic couplings
).
(4) Open the implement locking mechanism
(see
6.4 Operating the implement locking
(5) Switch on the tractor.
Fig. 69 Coupling the control circuit
B0AZ
Fig. 70 Positioning the implement for putting down
Fig. 71 Releasing the hydraulic lines
B0BX
B0BF