Installation and Service Manual
53
SK 2055 / 2070 / 2090
When working, the temporary mains power connection can be disconnected,
and the cable channels fastened using spacer bushings, screws and rings.
8.6 Cylinder bleeding
The cylinders are fitted with an SW10 nipple for bleeding air at the top. While
raising, turn the nipples once round to loosen them and wait until there is a
constant flow of oil without air bubbles. Then turn the nipples to the closed
position.
8.7 Testing
Once all the installation work has been done and the checks carried out, the lift
needs to be tested with a full load.
8.8 Load test
In order to carry out the static and dynamic tests on the Freedomlift as per DRT
circular no. 2005-04 dated 24-Mar-2005 perform:
• a static test of 60 minutes.
• a dynamic test of 15 minutes.
Perform the tests with a coefficient of 1.10.
Failure to follow these instructions could damage the lifting system and thereby
risk invalidating the warranty.
Содержание Freedomlift SK 2055
Страница 1: ...SK 2055 2070 2090 Installation and Service Manual 2017 Stertil B V Original manual no 35000811 D ...
Страница 108: ...Installation and Service Manual 108 SK 2055 2070 2090 14 2 Electrical diagram 3 x 230V ...
Страница 109: ...Installation and Service Manual 109 SK 2055 2070 2090 14 3 Electrical diagram 3 x 400V ...
Страница 112: ...Installation and Service Manual 112 SK 2055 2070 2090 14 5 Dimensions SK 2055 extended flex arms ...
Страница 113: ...Installation and Service Manual 113 SK 2055 2070 2090 14 6 Dimensions SK 2055 3 piece arms ...
Страница 114: ...Installation and Service Manual 114 SK 2055 2070 2090 14 7 Dimensions SK 2070 SK 2090 2 piece arms ...
Страница 115: ...Installation and Service Manual 115 SK 2055 2070 2090 14 8 Dimensions SK 2070 SK 2090 3 piece arms ...