background image

 

 

27

EEProm 
Error 

The EEProm of the controller cannot be read or 
described any longer. Remedy: interrupt the 
controller’s supply of voltage and reconnect it 
again. If the error cannot be cleared, please see 
your authorised dealer 

  Disconnect the charge 

controller and reconnect it in 
the order described. If the 
indication remains, the 
controller must return to the 
dealer for repair. 

self test 
failure 
 

The self-test could not have been carried out 
correctly, since the solar generator or the load 
had not been disconnected. On of the power 
components or any other does not function 

  Disconnect module and load 

  If the self-test still failed, the 

controller should be sent to 
the producer. 

Night 

“night” message during the day  
no “night” message during night 

  Module polarity wrong 

  Parallel blocking diodes with 

20 kOhm 

14 

13B

Legal Guarantee 

In accordance with German statutory regulations, there is a 2-year legal guarantee on this product for the 
customer.  

The seller will remove all manufacturing and material faults that occur in the product during the legal 
guarantee period and affect the correct functioning of the product. Natural wear and tear does not 
constitute a malfunction. Legal guarantee does not apply if the fault can be attributed to third parties, 
unprofessional installation or commissioning, incorrect or negligent handling, improper transport, 
excessive loading, use of improper equipment, faulty construction work, unsuitable construction location 
or improper operation or use. Legal guarantee claims shall only be accepted if notification of the fault is 
provided immediately after it is discovered. Legal guarantee claims are to be directed to the seller.  

The seller must be informed before legal guarantee claims are processed. For processing a legal 
guarantee claim an exact fault description and the invoice / delivery note must be provided.  

The seller can choose to fulfil the legal guarantee either by repair or replacement. If the product can 
neither be repaired nor replaced, or if this does not occur within a suitable period in spite of the 
specification of an extension period in writing by the customer, the reduction in value caused by the fault 
shall be replaced, or, if this is not sufficient taking the interests of the end customer into consideration, the 
contract is cancelled. 

Any further claims against the seller based on this legal guarantee obligation, in particular claims for 
damages due to lost profit, loss-of-use or indirect damages are excluded, unless liability is obligatory by 
German law. 

  

15 

14B

Accessories 

Current sensor 200A   

PA HS200 

 

Power line receiver   

PA 15   

Load relais 200A 

 

PA EV200 

Battery temp.sensor   

PA TS10 (included)   

Data logger   

 

TarCom (opt. GSM modem, ethernet) 

Содержание Power Tarom 2070

Страница 1: ...tion and Operation Instruction Manual System Manager for Photovoltaic systemes Power Tarom Tarom 2070 Tarom 2140 Tarom 4055 Tarom 4110 Tarom 4140 09 47 PHOTOVOLTAIK PHOTOVOLTAIC PHOTOVOLTAIQUE FOTOVOL...

Страница 2: ...ET CONFIGURATIONS 11 6 2 MAIN MENU 12 6 3 MENU MANU 12 6 4 MENU LOGG 13 6 5 MENU CONF 13 6 6 MENU PROG 14 6 7 EXAMPLE OF CONFIGURATION 17 6 8 EXAMPLE OF PROGRAMMING 18 7 INSTALLATION 18 7 1 PRECAUTION...

Страница 3: ...work Read the chapter Installation chapter 7 page 18 Make sure that all Precautions chapter 7 1 page 18 are taken Only start to install your System Manager when you are sure that you have understood a...

Страница 4: ...ected to this System Manager the user has to accept the consequences 2 Quick installation instructions Please do all steps following the numbers below Do not go ahead if any step failed 1 Check system...

Страница 5: ...t automatically registers the maximum permissible temperature and disconnect the loads in the case it is exceeded Now the complete radiating surface of the heat sink could be used for the power loss p...

Страница 6: ...ut parallel operation of System Managers As soon as the charge current of the main solar array connected directly to the System Manager is reduced to a minimum the second array will be disconnected fr...

Страница 7: ...he internal resistance of the battery itself are compensated automatically in the sophisticated patented software inside the System Manager without using extra sensor cables In order to protect the ba...

Страница 8: ...n prevents uncontrolled gassing within the battery cells The gas development is depending on the acid temperature and cell voltage So the System Manager monitors the ambient temperatures and adjusts t...

Страница 9: ...and can only then be programmed if the battery has been configured to be of liquid electrolyte type It is activated when the battery falls below a certain SOC status 4 2 7 Automatic Monthly Mixture O...

Страница 10: ...cates how much remaining capacity the battery still has The SOC is never 100 as due to technical reasons it is easier to indicate a two digit number U Bat Since the voltage drop between System Manager...

Страница 11: ...5 2 Alarm contact All PowerTaroms are equipped with a signal contact See illustration in chapter 6 4 to locate the terminals The signal relais switches if a system fault occurs under over voltage over...

Страница 12: ...nter the corresponding menu Other than this Main Menu the keys always have the normal functions described below to navigate through menus With the arrow keys you can scr parameters can be changed by t...

Страница 13: ...sing blocking diodes in the module cables In the System Manager there is a small data logger built in which can be used for a quick view of the energy allocation To conduct research where data of an e...

Страница 14: ...ated state of charge of the battery After entering this menu by pressing OK you may switch with the keys associated SOC in SOC 12V system 24V system 48V system 0 10 9 V 21 8V 43 6V 10 10 90 10 99V 21...

Страница 15: ...charge should be activated After having entered the window by pressing OK the first line shows Boost___voltage and you may alter the voltage appearing in the second line by pressing the arrow keys By...

Страница 16: ...disconnectio System Manager allows only these values for disconnect an difference of 0 8V 12V 1 6V 24V und 3 2 disconnection you must first increase Possibilities for programming by voltage r The char...

Страница 17: ...ogram the acid density and the equalizing charging equal charging When the configuration is set to these windows are not activated Battery Typ By pressing any one of the 4 keys under the cover you lea...

Страница 18: ...ow keys to avoid changing the values Hint If you have programmed a wrong value you will again reach the window with the undesired value by pressing the OK key a few times When you have reached the win...

Страница 19: ...ust be out of children s and unauthorized persons reach The basis on which controller is to be installed should not be easily flammable During operation the backside of the controller cooling body hea...

Страница 20: ...ndispensable to install a safety fuse directly on the battery pole This fuse sec For isolated systems it is not necessary not common or even not permitted by national laws to ground connect the compon...

Страница 21: ...ation of safety fuses Finally secure all cables within the controller s immediate surrounding by strain relieves All other components must also be strain relieved 7 5 Uninstalling Uninstall the regula...

Страница 22: ...bviously Even a discharge between clouds or a strike far can induce energy pulses into the elec conducting parts of the installation like wires structure or electronic components Not even a visible an...

Страница 23: ...GND GND GND lay grounding cables separately to the DC cables Inside protection zone protected photovoltaic field Outside protection zone unprotected photovoltaic field avoid loops between module cabl...

Страница 24: ...in and out the battery are calculated and displayed at this PowerTarom and his TarCom logger You only need one HS200 for the whole system Currents higher than the maximum of 200A will not layed but d...

Страница 25: ...2x M40 14 28mm 4x M32 12 21mm 1x M25 17mm t 12 2 le glands and t sink PowerTarom 2140 4110 and 4140 4x M40 14 28mm 2x M32 wo heat sinks 1mm 1x M25 8 17mm Weight 9 k 10 kg 9 kg 10 kg g 10kg Dimensions...

Страница 26: ...s the three left keys ok together to reset the display Module current The module current exceeds the max currents allowed Although this will not cause a defect The solar generator exceeds the nominal...

Страница 27: ...ties unprofessional installation or commissioning incorrect or negligent handling improper transport excessive loading use of improper equipment faulty construction work unsuitable construction locati...

Страница 28: ......

Отзывы: