© 2022 Staheli West
245
Daily Maintenance Checklist
PRE-OPERATION
STEP(S)
Grease PTO anti-rotating shields
1
Check engine coolant and oil levels
2-3
Check water separator
4
Clean supply water filter (T-strainer)
5-8
Drain 30-40 gallons of water from boiler
9
Inspect gauges, sensors and sight glasses
10
Purge steam through all baler hardware nozzles
11
POST-OPERATION
STEP(S)
Clean generator and engine with compressed air
1
Purge hot water through the Y-strainer for 2-3 seconds
2
Remove crop debris from enclosed areas
3
Purge steam through baler hardware nozzles to clear debris
4
1st OPERATION
Wheel nut torque check (See 500 hour maintenance step 9)
Steering hinge gap check/adjustments (See 1500 hour maintenance step 2)
Check/Adjust engine speed so that frequency is 61-62.5hz (See 250 hour maintenance
steps 5-7)
.5