Pre
p
a
r
a
tio
n
Ope
r
a
tion
W
a
ter
Read the
“Owner’s Manual
”
A
lw
ay
s make su
re
hy
dr
aulic
br
akes a
re hooked up and
fun
ctioning p
rope
rly
.
A
lw
ay
s lock the s
tee
ring axles on
the s
teamer and baler when
tr
av
eling on
road
w
ay
s, ope
ra
ting
on hillside
s, or bac
king u
p.
Ideal baling moistu
re
, with
st
eam, is 11% - 15%
Never exceed 1
35°
F (
57
° C)
internal bale temperature.
Never stack hay if internal bale temperature exceeds 115
° F
(45
° C)
D
o not bale with s
tem moistu
re
St
eamed bales should be tig
htly
packed with good leaf p
at
te
rn.
Sides of bales should be smooth but not smea
re
d.
A
lw
ay
s use boiler
w
at
er t
re
at-
me
nt chemical in boiler
w
at
er
.
A
lw
ay
s use app
rop
ria
te
w
at
er
tr
ea
tme
nt equipme
nt (
So
ft
ene
r,
RO
) t
o t
re
at boiler
w
at
er
.
M
ake su
re P
PM setting in
co
nt
roller m
at
ches the
results of
your
w
at
er
tes
t.
appear in bale
s, check the P
PM
setting in the
co
nt
rolle
r, d
rain
the
w
at
er out of the boile
r, and
con
ce
nt
ra
tions of mine
rals in
boiler
w
at
er will cause
foaming
which will cause
w
at
er
to ca
rr
y
ov
er i
nt
o the s
team.
K
eys to Succe
s
s
The Owner’s Manual, Troubleshooting Guides, Training Videos and more can be found on the “Customer Portal”. Go to www.staheliwest.com/customer