Spike Systems: PBG System Family Installation
16
2.3 Plate Barrier Gate Component Weights
Component(s)
Weights
Component(s)
Weight (pounds)
Cabinets
Pallet with Control and Non-‐
Control Cabinet
860
Control Cabinet
495
Non-‐Control Cabinet
330
Barrier Plates
PBG-‐100 Plate
1015
PBG-‐120 Plate
1200
PBG-‐140 Plate
1385
PBG-‐160 Plate
1569
All weights are
approximate
and may vary or change without notification.
Prior to any installation process, ensure that the area where the Spike System is to be installed is
free of any debris to ensure that all components rest squarely on the ground.
Tool Required
Tool Type
Tool Specification
Broom and dust pan;
air compressor and
or vacuum cleaner
As available to clean
surface where system
is to be installed
2.4 Plate Barrier Gate (PBG) System Installation
For ease of installation, it is recommended that the inner panels be removed from the Control
and Non-‐Control Cabinet assemblies. The illustration below shows both inner panels exploded
from the assembly view of a PBG-‐100.
Содержание PBG Series
Страница 8: ...Spike Systems PBG System Family Installation vi...
Страница 17: ...Spike Systems PBG System Family Installation 9 Figure 7 PBG 120 RH DB Right Handed Double Buttress...
Страница 20: ...Spike Systems PBG System Family Installation 12 Figure 10 PBG 100 LH RH DB Left Right Handed Double Buttress...
Страница 22: ...Spike Systems PBG System Family Installation 14 INTENTIONALLY BLANK...
Страница 31: ...Spike Systems PBG System Family Installation 23 Figure 19 Wood Blocks Used Under the Plate 3 Locations 3 of 3...
Страница 53: ...Spike Systems PBG System Family Installation 45 Figure 51 Limit Switch Wiring Usually Performed at Factory...
Страница 56: ...Spike Systems PBG System Family Installation 48 Figure 54 Siemens PLC Wiring Scheme...
Страница 57: ...Spike Systems PBG System Family Installation 49 Figure 55 Schneider LC1 D25 Relay Control Cabinet...
Страница 59: ...Spike Systems PBG System Family Installation 51 Figure 57 TB 1 Terminal Block Factory Wiring Control Cabinet...
Страница 60: ...Spike Systems PBG System Family Installation 52 Figure 58 TB 2 Terminal Block Factory Wiring Control Cabinet...
Страница 64: ...Spike Systems PBG System Family Installation 56 Figure 64 Left Side Electrical Schematic Control Cabinet...
Страница 65: ...Spike Systems PBG System Family Installation 57 Figure 65 Right Side Electrical Schematic Control Cabinet...
Страница 66: ...Spike Systems PBG System Family Installation 58 Figure 66 Entire Electrical Schematic Control Cabinet...
Страница 67: ...Spike Systems PBG System Family Installation 59 Figure 67 Motor Pump and Fluid Reservoir Control Cabinet...
Страница 68: ......
Страница 82: ...Spike Systems PBG System Family Installation 74...
Страница 84: ......
Страница 90: ...Spike Systems PBG System Family Installation 82...
Страница 91: ...Spike Systems PBG System Family Installation 83...
Страница 92: ...Spike Systems PBG System Family Installation 84...
Страница 93: ...Spike Systems PBG System Family Installation 85...
Страница 94: ...Spike Systems PBG System Family Installation 86...