Spike Systems: PBG System Family Installation
69
4.5 Maintenance Reference Information
Gate Access Controller I/O
Terminal
No.
PLC
Address
Description
Voltage
Notes
L1
X
Main Power Terminal Block
110 VAC
1
X
Switched Power Terminal Block
110 VAC
2
X
PLC Fuse Block
110 VAC
Fuse size 1A
3
X
PLC Output Fuse Block
110 VAC
Fuse size 8A
47
X
Neutral
110 VAC
49
X
Pump Neutral
110 VAC
Pump Terminal
50
X
Pump Power
110 VAC
Gate Access Controller Input 24 VDC
Terminal
No.
PLC
Address
Description
Voltage
Notes
30
X
Fuse block F4 +24 VDC fusing PLC
power supply (to PLC L+)
+24 VDC
Fuse size 500mA
31
X
-24 VDC PLC sensor power return
-24 VDC
32
X
Fused from F4 +24 VDC fusing PLC
sensor power supply (PLC L+ to TB1
30)
+24 VDC
Fused @ 500mA
15
DIa .0
Trip signal (OPEN)
Sinking
24 VDC
16
DIa .1
Retract signal (CLOSE)
17
DIa .2
Limit switch signal (Down position)
Sinking
24 VDC
18
DIa .3
Limit switch signal (Up position)
Sinking
24 VDC
19
-
-
-
20
-
-
-
21
-
-
-
22
-
-
-
23
-
-
-
24
-
Loop Wire
-
25
-
Loop Wire
-
Содержание PBG Series
Страница 8: ...Spike Systems PBG System Family Installation vi...
Страница 17: ...Spike Systems PBG System Family Installation 9 Figure 7 PBG 120 RH DB Right Handed Double Buttress...
Страница 20: ...Spike Systems PBG System Family Installation 12 Figure 10 PBG 100 LH RH DB Left Right Handed Double Buttress...
Страница 22: ...Spike Systems PBG System Family Installation 14 INTENTIONALLY BLANK...
Страница 31: ...Spike Systems PBG System Family Installation 23 Figure 19 Wood Blocks Used Under the Plate 3 Locations 3 of 3...
Страница 53: ...Spike Systems PBG System Family Installation 45 Figure 51 Limit Switch Wiring Usually Performed at Factory...
Страница 56: ...Spike Systems PBG System Family Installation 48 Figure 54 Siemens PLC Wiring Scheme...
Страница 57: ...Spike Systems PBG System Family Installation 49 Figure 55 Schneider LC1 D25 Relay Control Cabinet...
Страница 59: ...Spike Systems PBG System Family Installation 51 Figure 57 TB 1 Terminal Block Factory Wiring Control Cabinet...
Страница 60: ...Spike Systems PBG System Family Installation 52 Figure 58 TB 2 Terminal Block Factory Wiring Control Cabinet...
Страница 64: ...Spike Systems PBG System Family Installation 56 Figure 64 Left Side Electrical Schematic Control Cabinet...
Страница 65: ...Spike Systems PBG System Family Installation 57 Figure 65 Right Side Electrical Schematic Control Cabinet...
Страница 66: ...Spike Systems PBG System Family Installation 58 Figure 66 Entire Electrical Schematic Control Cabinet...
Страница 67: ...Spike Systems PBG System Family Installation 59 Figure 67 Motor Pump and Fluid Reservoir Control Cabinet...
Страница 68: ......
Страница 82: ...Spike Systems PBG System Family Installation 74...
Страница 84: ......
Страница 90: ...Spike Systems PBG System Family Installation 82...
Страница 91: ...Spike Systems PBG System Family Installation 83...
Страница 92: ...Spike Systems PBG System Family Installation 84...
Страница 93: ...Spike Systems PBG System Family Installation 85...
Страница 94: ...Spike Systems PBG System Family Installation 86...