Spike Systems: PBG System Family Installation
30
When the hoses have been extended through the track to the Non-‐Control Cabinet, carefully
route the hoses to the location of the Hydraulic Cylinder on the Non-‐Control Cabinet ensuring
that there are no kinks or sharp bends in the hydraulic hoses.
Attach the hydraulic hoses to the Hydraulic Cylinder in two locations in the Non-‐Control Cabinet.
The Control Cabinet hoses are already attached.
NOTE
– Both hydraulic hoses are color coded to correspond to color codes on the hydraulic
cylinder. Ensure that the RED coded hose is attached to the RED coded location on the hydraulic
cylinder in the Non-‐Control Cabinet. In a similar fashion, ensure that the GREEN coded hose is
attached to the GREEN coded location on the hydraulic cylinder in the Non-‐Control Cabinet.
NOTE: The RED hose is attached to the TOP of the Hydraulic Cylinder, and the GREEN hose is
attached to the BOTTOM, corresponding to the color code markings on both the hoses and the
Cylinder.
When the system is fully installed and is operated for the first time, if the motor engages but the
plate does not move, ensure that the hoses are correctly installed. If the hoses are reversed, the
system will try to close an already closed gate
.
Figure 30 – Minor Positional Adjustments
Содержание PBG Series
Страница 8: ...Spike Systems PBG System Family Installation vi...
Страница 17: ...Spike Systems PBG System Family Installation 9 Figure 7 PBG 120 RH DB Right Handed Double Buttress...
Страница 20: ...Spike Systems PBG System Family Installation 12 Figure 10 PBG 100 LH RH DB Left Right Handed Double Buttress...
Страница 22: ...Spike Systems PBG System Family Installation 14 INTENTIONALLY BLANK...
Страница 31: ...Spike Systems PBG System Family Installation 23 Figure 19 Wood Blocks Used Under the Plate 3 Locations 3 of 3...
Страница 53: ...Spike Systems PBG System Family Installation 45 Figure 51 Limit Switch Wiring Usually Performed at Factory...
Страница 56: ...Spike Systems PBG System Family Installation 48 Figure 54 Siemens PLC Wiring Scheme...
Страница 57: ...Spike Systems PBG System Family Installation 49 Figure 55 Schneider LC1 D25 Relay Control Cabinet...
Страница 59: ...Spike Systems PBG System Family Installation 51 Figure 57 TB 1 Terminal Block Factory Wiring Control Cabinet...
Страница 60: ...Spike Systems PBG System Family Installation 52 Figure 58 TB 2 Terminal Block Factory Wiring Control Cabinet...
Страница 64: ...Spike Systems PBG System Family Installation 56 Figure 64 Left Side Electrical Schematic Control Cabinet...
Страница 65: ...Spike Systems PBG System Family Installation 57 Figure 65 Right Side Electrical Schematic Control Cabinet...
Страница 66: ...Spike Systems PBG System Family Installation 58 Figure 66 Entire Electrical Schematic Control Cabinet...
Страница 67: ...Spike Systems PBG System Family Installation 59 Figure 67 Motor Pump and Fluid Reservoir Control Cabinet...
Страница 68: ......
Страница 82: ...Spike Systems PBG System Family Installation 74...
Страница 84: ......
Страница 90: ...Spike Systems PBG System Family Installation 82...
Страница 91: ...Spike Systems PBG System Family Installation 83...
Страница 92: ...Spike Systems PBG System Family Installation 84...
Страница 93: ...Spike Systems PBG System Family Installation 85...
Страница 94: ...Spike Systems PBG System Family Installation 86...