Spike Systems: PBG System Family Installation
64
4.3.5 On-‐Going Maintenance Tasks: Hydraulic Pump
WARNING:
BEFORE YOU USE A MATERIAL, REFER TO THE
MANUFACTURES’ MATERIAL SAFETY DATA SHEETS FOR
SAFETY INFORMATION. SOME MATERIALS CAN BE
DANGEROUS.
Scheduled Maintenance
Period
Maintenance
Daily
Check HPU manifold for leakage.
Weekly
Check HPU reservoir fluid level.
Semi-Annually Change hydraulic fluid (heavy use).
Annually
Change hydraulic fluid (moderate use).
Material Part Numbers
Description
Brand
Part No.
Quantity
Hydraulic
Fluid
DEXRON III ATF Fluid
HO-2
3 Liters
4.4 Possible Field Repair Tasks
The following sections provide information on possible field replacement tasks that may
be required. When the Spike System is initially shipped, these tasks have already been
completed by the factory. These instructions will aid the client maintenance staff repair
and replace certain items should they become damaged during normal system
operation
4.4.1
Plate Replacement
If it is ever necessary to attach a new Plate to the hinge assembly, use the following as a
guideline for attaching the two components.
Содержание PBG Series
Страница 8: ...Spike Systems PBG System Family Installation vi...
Страница 17: ...Spike Systems PBG System Family Installation 9 Figure 7 PBG 120 RH DB Right Handed Double Buttress...
Страница 20: ...Spike Systems PBG System Family Installation 12 Figure 10 PBG 100 LH RH DB Left Right Handed Double Buttress...
Страница 22: ...Spike Systems PBG System Family Installation 14 INTENTIONALLY BLANK...
Страница 31: ...Spike Systems PBG System Family Installation 23 Figure 19 Wood Blocks Used Under the Plate 3 Locations 3 of 3...
Страница 53: ...Spike Systems PBG System Family Installation 45 Figure 51 Limit Switch Wiring Usually Performed at Factory...
Страница 56: ...Spike Systems PBG System Family Installation 48 Figure 54 Siemens PLC Wiring Scheme...
Страница 57: ...Spike Systems PBG System Family Installation 49 Figure 55 Schneider LC1 D25 Relay Control Cabinet...
Страница 59: ...Spike Systems PBG System Family Installation 51 Figure 57 TB 1 Terminal Block Factory Wiring Control Cabinet...
Страница 60: ...Spike Systems PBG System Family Installation 52 Figure 58 TB 2 Terminal Block Factory Wiring Control Cabinet...
Страница 64: ...Spike Systems PBG System Family Installation 56 Figure 64 Left Side Electrical Schematic Control Cabinet...
Страница 65: ...Spike Systems PBG System Family Installation 57 Figure 65 Right Side Electrical Schematic Control Cabinet...
Страница 66: ...Spike Systems PBG System Family Installation 58 Figure 66 Entire Electrical Schematic Control Cabinet...
Страница 67: ...Spike Systems PBG System Family Installation 59 Figure 67 Motor Pump and Fluid Reservoir Control Cabinet...
Страница 68: ......
Страница 82: ...Spike Systems PBG System Family Installation 74...
Страница 84: ......
Страница 90: ...Spike Systems PBG System Family Installation 82...
Страница 91: ...Spike Systems PBG System Family Installation 83...
Страница 92: ...Spike Systems PBG System Family Installation 84...
Страница 93: ...Spike Systems PBG System Family Installation 85...
Страница 94: ...Spike Systems PBG System Family Installation 86...