i
Table of Contents
Section 1 -‐ Pre-‐Installation Planning and Considerations ........................................ 1
1.1 WARNINGS AND NOTICES ....................................................................................................... 1
1.2 Product Model Numbers ......................................................................................................... 2
1.3 Product Family Description and Specifications .............................................................. 2
1.4 Right or Left Side Configuration ........................................................................................... 3
1.5 Spike Systems Plate Barrier Gate (PBG) Product Family Overview......................... 4
1.5.1 PBG-‐100 As Installed and Dimensions for Installation Planning....................................4
1.5.1 PBG System Family Parts Identification and Shipping Contents.....................................5
1.6 Configuration Options of the PBG Family.......................................................................... 6
1.6.1 Standard Layout (Universal)...........................................................................................................6
1.6.2 Sample PBG-‐100 Layout....................................................................................................................7
1.6.3 Sample PBG-‐120 RH and LH Layout ............................................................................................8
1.6.4 Sample PBG-‐160 RH and LH Layout ......................................................................................... 10
1.6.5 Sample PBG-‐100 Special Layouts............................................................................................... 11
Section 2 – Physical Installation.......................................................................................15
2.1 Installation Planning..............................................................................................................15
2.2 Installation Preparation: System Unpacking .................................................................15
2.3 Plate Barrier Gate Component Weights...........................................................................16
2.4 Plate Barrier Gate (PBG) System Installation ................................................................16
2.5 Pre-‐Installation: Ensure Power and Data Conduits are in Place .............................18
2.6 Pre-‐Installation Considerations: Inductive Loop Vehicle Detector........................18
2.7 Saw Cut Inductive Loop Vehicle Detector as Preparation for Installation...........19
2.8 Plate and Cabinet Placement and Preparation (Left Hand Shown)........................21
2.8.1 Position the Control Cabinet Close to the and Plate Barrier .......................................... 24
2.8.2 Position the Non-‐Control Cabinet Close to the Plate Barrier......................................... 25
2.8.3 Hydraulic Cylinder Installation to Barrier Plate.................................................................. 26
Section 3 – Hydraulic, Electrical, and Control Installation ...............................................27
3.1 Hydraulic Hose Installation .................................................................................................27
3.2 Installation of Concrete Anchors........................................................................................33
3.2.1 System View Prior to Anchor Installation.............................................................................. 33
3.2.2 Anchor Bolt Installation ................................................................................................................. 34
3.3 Verify Proper Alignment of Upper Limit Switch within Control Cabinet .............37
3.4 Replace Inside Panels for Control and Non-‐Control Cabinets ..................................39
3.5 AC Power Connection .............................................................................................................39
3.6 Traffic Control Signal Mounting .........................................................................................41
3.6.1 Wiring for Traffic Control Signal ................................................................................................ 42
3.7 Wiring for Remote Operating Switch (Guard Shack, Typically) ..............................43
3.8 Installation Electrical Reference Information...............................................................46
Section 4 -‐ System Operation and Maintenance..........................................................61
4.1 Barrier Gate Manual Operation ..........................................................................................61
4.2 Barrier Gate Emergency Operation: Manual Gate Lowering ....................................61
4.3 Important Hydraulic Power Unit (Pump) Information ..............................................62
4.3.1 Observations and Recommendations ...................................................................................... 62
4.3.2 Seal Kits and Components............................................................................................................. 62
4.3.3 Hydraulic Hose Connections ........................................................................................................ 63
4.3.4 Pump Adjustments ........................................................................................................................... 63
Содержание PBG Series
Страница 8: ...Spike Systems PBG System Family Installation vi...
Страница 17: ...Spike Systems PBG System Family Installation 9 Figure 7 PBG 120 RH DB Right Handed Double Buttress...
Страница 20: ...Spike Systems PBG System Family Installation 12 Figure 10 PBG 100 LH RH DB Left Right Handed Double Buttress...
Страница 22: ...Spike Systems PBG System Family Installation 14 INTENTIONALLY BLANK...
Страница 31: ...Spike Systems PBG System Family Installation 23 Figure 19 Wood Blocks Used Under the Plate 3 Locations 3 of 3...
Страница 53: ...Spike Systems PBG System Family Installation 45 Figure 51 Limit Switch Wiring Usually Performed at Factory...
Страница 56: ...Spike Systems PBG System Family Installation 48 Figure 54 Siemens PLC Wiring Scheme...
Страница 57: ...Spike Systems PBG System Family Installation 49 Figure 55 Schneider LC1 D25 Relay Control Cabinet...
Страница 59: ...Spike Systems PBG System Family Installation 51 Figure 57 TB 1 Terminal Block Factory Wiring Control Cabinet...
Страница 60: ...Spike Systems PBG System Family Installation 52 Figure 58 TB 2 Terminal Block Factory Wiring Control Cabinet...
Страница 64: ...Spike Systems PBG System Family Installation 56 Figure 64 Left Side Electrical Schematic Control Cabinet...
Страница 65: ...Spike Systems PBG System Family Installation 57 Figure 65 Right Side Electrical Schematic Control Cabinet...
Страница 66: ...Spike Systems PBG System Family Installation 58 Figure 66 Entire Electrical Schematic Control Cabinet...
Страница 67: ...Spike Systems PBG System Family Installation 59 Figure 67 Motor Pump and Fluid Reservoir Control Cabinet...
Страница 68: ......
Страница 82: ...Spike Systems PBG System Family Installation 74...
Страница 84: ......
Страница 90: ...Spike Systems PBG System Family Installation 82...
Страница 91: ...Spike Systems PBG System Family Installation 83...
Страница 92: ...Spike Systems PBG System Family Installation 84...
Страница 93: ...Spike Systems PBG System Family Installation 85...
Страница 94: ...Spike Systems PBG System Family Installation 86...