Spike Systems: PBG System Family Installation
15
Section 2 – Physical Installation
2.1 Installation Planning
Often when a Spike System is installed, another lower-‐cost barrier gate is installed in front of the
Spike Systems unit. This is to protect against damage caused by low-‐speed and inadvertent
actions by the driver. These lower cost gates are available from Spike systems. Typically, a
Magnetic Autocontrol MicroDrive MHTM is most commonly installed for this purpose. These
secondary gates can be installed before, during or after the installation of the Spike Systems
barrier. The MHTH is packaged separately and has a comprehensive installation manual that
should be referenced throughout the installation process. Detailed information on these
systems can be found on the Internet at:
https//magneticgateopeners.com/store/pdfs/microdrive-‐manual.pdf
.
2.2 Installation Preparation: System Unpacking
All PBG systems are shipped to the installation site on custom designed pallets. An example is
shown below.
NOTE
– Use a forklift or a sufficient number of laborers to lift the shipped pallets,
the Control Cabinet (shown on the left), and the Non-‐Control Cabinet (shown on the right), the
Plate Barrier Gate assembly (not pictured). The use of safety gloves is advised whenever lifting
or handling PBG cabinets and components. Unbolt the Control and Non-‐Control Cabinets from
the custom pallet using a 1/2“ wrench or ratcheting socket.
Figure 12 -- Control and Non-Control Cabinets Secured to Shipping Pallet
Tool Required
Tool Type
Tool Specification
½” Wrench/Socket
To remove hardware
securing system
cabinets to pallets
Safety Gloves
Содержание PBG Series
Страница 8: ...Spike Systems PBG System Family Installation vi...
Страница 17: ...Spike Systems PBG System Family Installation 9 Figure 7 PBG 120 RH DB Right Handed Double Buttress...
Страница 20: ...Spike Systems PBG System Family Installation 12 Figure 10 PBG 100 LH RH DB Left Right Handed Double Buttress...
Страница 22: ...Spike Systems PBG System Family Installation 14 INTENTIONALLY BLANK...
Страница 31: ...Spike Systems PBG System Family Installation 23 Figure 19 Wood Blocks Used Under the Plate 3 Locations 3 of 3...
Страница 53: ...Spike Systems PBG System Family Installation 45 Figure 51 Limit Switch Wiring Usually Performed at Factory...
Страница 56: ...Spike Systems PBG System Family Installation 48 Figure 54 Siemens PLC Wiring Scheme...
Страница 57: ...Spike Systems PBG System Family Installation 49 Figure 55 Schneider LC1 D25 Relay Control Cabinet...
Страница 59: ...Spike Systems PBG System Family Installation 51 Figure 57 TB 1 Terminal Block Factory Wiring Control Cabinet...
Страница 60: ...Spike Systems PBG System Family Installation 52 Figure 58 TB 2 Terminal Block Factory Wiring Control Cabinet...
Страница 64: ...Spike Systems PBG System Family Installation 56 Figure 64 Left Side Electrical Schematic Control Cabinet...
Страница 65: ...Spike Systems PBG System Family Installation 57 Figure 65 Right Side Electrical Schematic Control Cabinet...
Страница 66: ...Spike Systems PBG System Family Installation 58 Figure 66 Entire Electrical Schematic Control Cabinet...
Страница 67: ...Spike Systems PBG System Family Installation 59 Figure 67 Motor Pump and Fluid Reservoir Control Cabinet...
Страница 68: ......
Страница 82: ...Spike Systems PBG System Family Installation 74...
Страница 84: ......
Страница 90: ...Spike Systems PBG System Family Installation 82...
Страница 91: ...Spike Systems PBG System Family Installation 83...
Страница 92: ...Spike Systems PBG System Family Installation 84...
Страница 93: ...Spike Systems PBG System Family Installation 85...
Страница 94: ...Spike Systems PBG System Family Installation 86...