Spike Systems: PBG System Family Installation
61
Section 4 -‐ System Operation and Maintenance
4.1 Barrier Gate Manual Operation
When all electrical connections have been made for the system, including all options,
apply power to the system via the AC circuit breaker. Next, ensure that the power
switch on the 4-‐gang electrical junction box is placed in the ON position.
Before testing the remote access devices (for example from a control shack), it is
recommended that the system operation be tested using the manual operating switch,
located on the outside of the electronic control compartment within the Control
Cabinet. This switch is identified in the figure below. When system functionality has
been verified from the manual operating switch, verify all other system controls.
Figure 68 – Manual Operating Switch Location
4.2 Barrier Gate Emergency Operation: Manual Gate Lowering
If it ever becomes necessary to lower a Barrier Gate manually, for example in the event
of power loss or other unusual situation, open the locking door on the Control Cabinet
to gain access to the system hydraulic pump. As pictured below, turning the pump
Содержание PBG Series
Страница 8: ...Spike Systems PBG System Family Installation vi...
Страница 17: ...Spike Systems PBG System Family Installation 9 Figure 7 PBG 120 RH DB Right Handed Double Buttress...
Страница 20: ...Spike Systems PBG System Family Installation 12 Figure 10 PBG 100 LH RH DB Left Right Handed Double Buttress...
Страница 22: ...Spike Systems PBG System Family Installation 14 INTENTIONALLY BLANK...
Страница 31: ...Spike Systems PBG System Family Installation 23 Figure 19 Wood Blocks Used Under the Plate 3 Locations 3 of 3...
Страница 53: ...Spike Systems PBG System Family Installation 45 Figure 51 Limit Switch Wiring Usually Performed at Factory...
Страница 56: ...Spike Systems PBG System Family Installation 48 Figure 54 Siemens PLC Wiring Scheme...
Страница 57: ...Spike Systems PBG System Family Installation 49 Figure 55 Schneider LC1 D25 Relay Control Cabinet...
Страница 59: ...Spike Systems PBG System Family Installation 51 Figure 57 TB 1 Terminal Block Factory Wiring Control Cabinet...
Страница 60: ...Spike Systems PBG System Family Installation 52 Figure 58 TB 2 Terminal Block Factory Wiring Control Cabinet...
Страница 64: ...Spike Systems PBG System Family Installation 56 Figure 64 Left Side Electrical Schematic Control Cabinet...
Страница 65: ...Spike Systems PBG System Family Installation 57 Figure 65 Right Side Electrical Schematic Control Cabinet...
Страница 66: ...Spike Systems PBG System Family Installation 58 Figure 66 Entire Electrical Schematic Control Cabinet...
Страница 67: ...Spike Systems PBG System Family Installation 59 Figure 67 Motor Pump and Fluid Reservoir Control Cabinet...
Страница 68: ......
Страница 82: ...Spike Systems PBG System Family Installation 74...
Страница 84: ......
Страница 90: ...Spike Systems PBG System Family Installation 82...
Страница 91: ...Spike Systems PBG System Family Installation 83...
Страница 92: ...Spike Systems PBG System Family Installation 84...
Страница 93: ...Spike Systems PBG System Family Installation 85...
Страница 94: ...Spike Systems PBG System Family Installation 86...