34
Enquiry if malt is already fillt in
6.4.2 Mashing explained step by step
Insert malt pipe
Insert the malt pipe with the seal facing
downwards. The seal and malt pipe must be
centred and absolutely flat on the boiler bottom.
Inserting the screen plate
Slide the screen plate with the sleeve up to the
bottom edge.
Содержание 41010-30
Страница 2: ......
Страница 6: ...Item no 45050 30 Braumeister PLUS 50 litres...
Страница 22: ...In the Settings section you will find options for setting language Wi Fi metrics sound etc Settings...
Страница 66: ...CHEE...
Страница 67: ...ERS 67 66...