32
Spectra ships the high pressure module with the white Z-Brane anode removed from its socket
to prevent shipping damage. Before the high pressure module (Clark Pump and membrane) is
mounted the anode should be installed.
The membrane housing has been capped with shipping plugs to keep the membranes clean
and moist during shipping and storage. Remove the C-clips that secure the shipping plugs,
then remove the shipping plugs. Insert an anode into the membrane until the groove is flush
with the membrane end plug. The C-clip will then slip into the groove, and the C-clip screw will
secure the clip.
C-Clip and retaining screw with
probe installed
Shipping Plug
(remove to
insert probe)
C-Clip groove in Anode
NOTE: your watermaker will
only have one membrane.
In these pictures there are
three membranes.
C CLip
Z-Brane Installation
Содержание Catalina 340 Z
Страница 2: ...2 ...
Страница 4: ...4 ...
Страница 6: ...6 ...
Страница 8: ...8 ...
Страница 10: ...10 ...
Страница 11: ...11 Installation ...
Страница 12: ...12 ...
Страница 22: ...22 John Guest Super Speedfit Fittings ...
Страница 34: ...34 ...
Страница 35: ...35 Operation ...
Страница 36: ...36 ...
Страница 44: ...44 ...
Страница 45: ...45 Maintenance Storage and Troubleshooting ...
Страница 46: ...46 ...
Страница 64: ...64 ...
Страница 65: ...65 MPC 5000 Programming and Controls ...
Страница 66: ...66 ...
Страница 76: ...76 ...
Страница 78: ...78 ...
Страница 79: ...79 Exploded Views and Part Numbers ...
Страница 80: ...80 ...
Страница 86: ...86 HP TB VEB B HP TB VB HP TB VEB A HP TB BV HP CB CB10 HP CYL SST HP CYL R HP CYL EC HP CYL CCA Not used ...
Страница 88: ...88 Parts ...
Страница 89: ...89 Parts PL MTS 3 8X1 2B HP CYL SST HP CYL CCA SO HPP ECCB HP CYL EC HP CYL R HP CYL PT Parts ...
Страница 90: ...90 ...