Speck pumpen VZ 11 B Series Скачать руководство пользователя страница 25

 
OPERATING INSTRUCTIONS 

 

 

 

 

25 

priate  filters  to  keep  the  pump  free  from  con-

taminants. 
During  operating  temperature,  the  kinematic 

viscosity  should  be  at  max.  4  mm

2

/s;  higher 

viscosity requires higher performance of drive. 

The steam pressure of the ring liquid should be 

at  16  mbar  during  vacuum  operation  at  work-

ing  temperature;  higher  steam  pressures 

reduce  the  suction  capacity  and  final  vacuum 

indicated  in  the  performance  tables  resp. 

characteristic curves. In case other ring liquids 

than water will be used, the performance data 

of the pump should be confirmed by us. 
When  delivering  other  liquids  as  well  (ca.  3-5 

times the volume of circulation liquid indicated 

in the brochure) the supply of clean liquid can 

be reduced considerably. 
A condensation of steam in the vacuum pump 

may  cause  cavitation  and  consequently  de-

stroy  parts  of  the  pump.  Therefore  a 

condensation  before  the  vacuum  pump  is 

preferrable  (injection  condensor,  surface 

condensor etc.) In some cases the condensate 

arising  can  also  be  delivered  by  the  vacuum 

pump.  Otherwise  a  separate  liquid  ring  pump 

has  to  be  provided.  The  specification  should 

be stipulated by the manufacturer/supplier. 
The  suction  capacity  listed  (resp.  the  flux 

volume  listed)  is  reached  by  an  operating 

temperature  of  15  °C.  An  operation  at  higher 

temperatures  of  operating  liquid  will  cause  a 

reduced  suction  capacity  (resp.  a  reduced 

volume flow), however, gives the possibility of 

safing fresh water resp. cooling liquid at open 

resp.  closed  circulation  cooling.  Such  liquid 

quantity should be regulated by the regulating 
valve  r

F

  resp.  r

B

  only  as  high  as  the  required 

suction  capacity  (resp.  the  required  volume 

flow)  will  be  reached,  however  cavitation  will 

be  prevented.  The  regulating  valve  has  to  be

 

locked

 

at this position. 

For  vacuum  operation  with  suction  pressures 

below  130  mbar  it  should  also  be  taken  care 

that  the  operating  water  temperature  should 

not  be  below  ca. 10°C, as otherwise the suc-

tion nozzle gets covered with ice. 

7.2 

Fresh water requirement 

For  continuous  cooling  a  fresh  water  quantity 

according to diagram 1 is necessary.  
The  fresh  water  requirement  for  open  circula-

tion  cooling  will  be  made  up  according  to 

diagram 1. For that, the temperature difference 

t  (temperature  of  operating  water  minus 

temperature  of  fresh  water)  has  to  be  stipu-

lated. In case that the operating temperature is 

too high and the vacuum is accordingly, cavita-

tion will occur.  
For  closed  circulation  cooling  the  flux  of  

circulating  liquid  corresponds  to  the  flux  of 

fresh  liquid  at  continuous  cooling.  The  liquid 

level has to be checked and possibly regulated 

from time to time at the liquid indicator. 
When  the  vacuum-pump  is  idle,  the  process 

liquid level may not be higher than the middle 

of the shaft. 
 

 

Diagr.1a: Fresh water requirement VZ 110-180 

 

 

 

Fr

es

w

at

er

 re

qu

ire

m

en

C

on

tin

uo

us

 c

oo

lin

[m

3

/h

]

 

Suction pressure [mbar] 

Fresh 

water 

requirement 

open circulation cooling [m³/h] 

Содержание VZ 11 B Series

Страница 1: ...H CO KG zertifiziert DIN EN ISO 9001 Betriebsanleitung Operating Instructions Mode d emploi Fl ssigkeitsring Vakuumpumpen Liquid Ring Vacuum Pumps Pompes vide anneau liquide VZ 110B VZ 180B VZ 110G VZ...

Страница 2: ...nzip 5 5 Aufstellung Einbau 5 5 1 Aufstellungsort 5 5 2 Einbau 5 5 3 Leitungen 6 5 3 1 Saugleitung 6 5 3 2 Druckleitung 6 5 4 Elektrischer Anschluss 6 5 5 Betriebsarten 7 5 5 1 Offene Umlaufk hlung 7...

Страница 3: ...lnbetriebnahme vom Monteur sowie dem zust ndigen Fachpersonal Betrei ber zu lesen und muss st ndig am Einsatzort der Pumpe Anlage verf gbar sein Es sind nicht nur die unter diesem Hauptpunkt Si cherh...

Страница 4: ...siehe z B Vorschriften des VDE und der rtlichen Energieversorgungsunter nehmen 2 6 Sicherheitshinweise f r War tungs Inspektions und Monta gearbeiten Der Betreiber hat daf r zu sorgen dass alle Wartu...

Страница 5: ...ne pulsation sarme Verdichtung Eine kontinuierliche Zuf hrung bzw K hlung der Betriebsfl ssigkeit im Normalfall Wasser ist erforderlich Sie f hrt die entstehende Ver dichtungsw rme ab und erg nzt die...

Страница 6: ...me zu pr fen 5 3 1 Saugleitung In der Saugleitung sollte ein R ckschlagventil eingebaut werden um das F llen der Vakuum leitung mit der Ringfl ssigkeit bzw um Druck abfall im Vakuum System zu vermeide...

Страница 7: ...it kein Wert gelegt wird Der Aufbau erfolgt nach Abb 5a Der An schluss UU wird verschlossen Die Betriebs fl ssigkeit B besteht aus Frischfl ssigkeit F Der erforderliche Frischfl ssigkeitsdruck soll 0...

Страница 8: ...turf hler zu rF2 UA Fl ssigkeitsablauf UB Anschluss f r Betriebsfl ssigkeit UN Anschluss f r Kontrollventil US Saugleitungsanschluss DU Druckleitungsanschluss UU Anschluss f r Umlauffl ssigkeit Ue Ent...

Страница 9: ...BETRIEBSANLEITUNG 9 Durchlaufk hlung Abb 4a nebenst Fl ssikeitsabscheider Abb 4b Fl ssigkeits Aufbauabscheider Beh lter mit Schwimmerventil Abb 4c nebenst Fl ssigkeitsabscheider...

Страница 10: ...BETRIEBSANLEITUNG 10 Geschlossene Umlauflaufk hlung Abb 5a nebenstehender Fl ssigkeitsabscheider Abb 5b Fl ssigkeits Aufbauabscheider Abb 6 Lage des Betriebswasseranschlusses...

Страница 11: ...s ue3 ein Ventil angeschlossen werden Ein automatisches Entleerungsventil an diesem Anschluss kontrolliert und reguliert den Fl ssigkeitsstand selbstt tig 6 3 3 Durchlaufk hlung nach Abb 4 Bei laufend...

Страница 12: ...eingestellt werden dass das gew nschte Saugverm gen bzw der gew nschte Volu menstrom erreicht jedoch Kavitation verhin dert wird Das Regulierventil ist in dieser Ein stellung zu blockieren Bei Vakuumb...

Страница 13: ...d ebenso des Saugverm gens eintritt siehe 7 2 Temperatur der Fl ssigkeit durch geeig nete Ma nahmen senken Gas bzw Fl ssigkeitskan le verschlossen Pumpe zerlegen und besonders die Kan le reinigen Glei...

Страница 14: ...2200 Gaseintrittstemperatur trocken 160 C wasserdampfges ttigt 80 C VZ 110 180 Drehzahl min 1 50Hz 60 Hz 1450 1750 Betriebsfl ssigkeit Temperatur 10 C 60 C Dichte 1200 kg m3 Viskosit t 4 mm2 s berdruc...

Страница 15: ...stallation 18 5 2 Installation 18 5 3 Pipes 19 5 3 1 Suction pipes 19 5 3 2 Discharge Pipes 19 5 4 Electrical connection 19 5 5 Operation modes 19 5 5 1 Open circulation cooling 19 5 5 2 Closed circul...

Страница 16: ...mp s place of opera tion at all times You should not just consider the general safety information listed in this point specific safety information is also con tained in the other main points 2 1 Marki...

Страница 17: ...ts who are adequately informed having thor oughly read these operating instructions Basically the pump must have stopped before carrying out any work on it The procedures described in the operating in...

Страница 18: ...Installation CAUTION The non observation of all safety informa tions given under 5 Setting up Installation shall invalidate any claims of warranty including claims for compensa tion of damages 5 1 Pla...

Страница 19: ...faultless electrical installation required taking into account appropriate guide lines and VDE regulations serious consideration is necessary of the pump s direction of rotation flow direction which i...

Страница 20: ...p will be provided with a gas ejector pump 5 6 Setting up of the unit A side mounted liquid separator has to be installed thus that the liquid discharge is at the same level as the shaft The liquid se...

Страница 21: ...PERATING INSTRUCTIONS 21 Setting up schema Open circulating cooling illustr 3a side mounted separator illustr 3b top mounted separator Illustr 3c thermostatically controlled process liquid temperature...

Страница 22: ...OPERATING INSTRUCTIONS 22 Continuous cooling Illustr 4a side mounted separator Illustr 4b top mounted separator Tank with float valve fitted Illustr 5a side mounted separator...

Страница 23: ...OPERATING INSTRUCTIONS 23 Closed circulation cooling Illustr 5a side mounted separator Illustr 4b top mounted separator Illustr 6 position of service liquid connection...

Страница 24: ...e connection Ue3 An automatic draining valve at this connection controles and regulates the liquid level auto matically 6 3 3 Continuous cooling according to illustr 5a Open shut off valve VF while th...

Страница 25: ...ty resp a reduced volume flow however gives the possibility of safing fresh water resp cooling liquid at open resp closed circulation cooling Such liquid quantity should be regulated by the regulating...

Страница 26: ...ozzle IG elevated by 300 mm or through a connecting pipe with nozzle to the liquid separator a The use of a gas ejector also avoids cavitation If a large amount of dirt is deposited it should be remov...

Страница 27: ...e 7 2 Reduce the temperature by suitable means gas resp liquid channels are closed disassembly the pump and especially clean the channels mechanical seal is leaking change mechanical seal pump does no...

Страница 28: ...200 compression pressure mbar 2500 2200 2200 gas entry temperature r dry vapour saturated 160 C 80 C speed min 1 VZ 110 180 50Hz 60 Hz 1450 1750 service liquid temperature 10 C 60 C density 1200 kg m3...

Страница 29: ...2 Mise en Place 32 5 3 Tuyauteries 33 5 3 1 Tubulure d aspiration 33 5 3 2 Tubulure de refoulement 33 5 4 Branchement lectrique 33 5 5 Modes de fonctionnement 34 5 5 1 R frig ration par circulation ou...

Страница 30: ...e monteur et le personnel sp cialis l exploitant avant le montage et la mise en service et qu il soit toujours disponible sur le lieu de la pompe de l installation En plus des r gles de s curit mentio...

Страница 31: ...ue doit tre exclu pour les d tails consulter les prescriptions sp cifiques du pays ainsi que celles des usines d lectricit locales 2 6 Instructions de s curiti pour l entretien inspection et travaux d...

Страница 32: ...cr un effet de compression impulsions r duites Il est necessaire d alimenter resp refrig rer continuellement le liquide de service norma lement de l eau Il dissipe la chaleur de com pression cr e et...

Страница 33: ...un clapet anti retour devrait tre install afin d viter que la conduite vide se rempli avec liquide de service resp afin d viter une chute de pression dans le syst me vide S il y a un organe d arr t va...

Страница 34: ...disponible en quantit suffisante et que l on n attache pas d int r t au recyclage du liquide de fonctionnement Si le gaz et le liquide ne doivent pas obligatoi rement tre vacu s s par ment on peut ren...

Страница 35: ...rin age UL Raccord pour robinet d a ration Sch ma d installation Refroidissement par circulation en circuit ouvert Fig 3a S parateur mont s par ment Fig 3b S parateur rapport Fig 3c R gulation thermo...

Страница 36: ...MODE D EMPLOI 36 Refroidissement en circuit ouvert Fig 4a S parateur mont s par ment Fig 4b S parateur rapport Fig 4c R servoir avec robinet flotteur...

Страница 37: ...MODE D EMPLOI 37 Refroidissement par circulation en circuit ferm Fig 5a S parateur mont s par ment Fig 5b S parateur rapport Fig 6 Emplacement du raccord d eau de fonctionnement...

Страница 38: ...e d arr t VK est ouverte Arr ter les robinets de r glage dans leur position Afin de contr ler le niveau de liquide N on peut raccorder une vanne au raccord Ue3 Une vanne de vidange automatique dans ce...

Страница 39: ...ique indiqu dans les prospectus et catalogues est obtenu pour une temp rature d eau de fonc tionnement de 15 C Un fonctionnement une temp rature d eau de fonctionnement plus lev e se traduit par une r...

Страница 40: ...u par le raccord de protection de cavitation une petite quantit de gaz qui ne condense pas la compression Ceci peut s effectuer par un robinet d a ration h une conduite remontant d environ 300 mm avec...

Страница 41: ...onter la pompe et nettoyer les canalisations Garniture m canique non tanche Remplacer la garniture m canique La pompe n atteint pas le vide voulu pression d bit D bit d eau d coulement A trop petit V...

Страница 42: ...de compression mbar 2500 2200 2200 temp rature d aspiration du gaz sec 160 C satur en vapeur d eau 80 C VZ 110 180 vitesse de rotation min 1 50Hz 60 Hz 1450 1750 anneau liquide temp rature 10 C 60 C p...

Страница 43: ...billes 330 Lagertr ger Bearing housing Corps paliers 360 1 2 Lagerdeckel Earing cover Convercle de roulement 411 1 3 Dichtring Joint ring Garniture d tanch it 412 O Ring o ring Joint torique 441 Geh...

Страница 44: ...MODE D EMPLOI 44 VZ B...

Страница 45: ...MODE D EMPLOI 45 VZ G...

Страница 46: ...MODE D EMPLOI 46...

Страница 47: ...MODE D EMPLOI 47...

Страница 48: ...05 Adresse SPECK PUMPEN Walter Speck GmbH CO KG Regensburger Ring 6 8 D 91154 Roth Tel 49 09171 809 0 Fax 49 09171 809 10 e mail info speck pumps d internet http www speck pumps de Vervielf ltigung je...

Отзывы: