![Speck pumpen CSY Series Скачать руководство пользователя страница 72](http://html.mh-extra.com/html/speck-pumpen/csy-series/csy-series_operating-instructions-manual_1341805072.webp)
Operating
Instructions
14
1096.0833 | CY, CSY, LNY, LSY, NPY, PY, Y, YS Series
05/2011
6
Operation
For aggregates in potentially explosive areas
(
ATEX additional instructions)
6.1 Preparations for commissioning
6.1.1
Checking shut-down period
►
Shut-down periods > 1 year: contact the manufacturer and
ask for required measures.
►
Shut-down periods < 1 year: take all steps as required for
commissioning (
Commissioning, page 14).
6.1.2
Filling and venting
1.
Fill the aggregate and the suction pipe with the medium to
be pumped and vent.
2.
Open the suction-side fitting (if available).
3.
Open the pressure-side fitting (if available).
4.
Make sure all ports and connections are tight.
6.2 Commissioning
6.2.1
Switch-on
Aggregate correctly set up
Motor connected to the power supply
All media connections stress-free and sealed
Pump/aggregate properly prepared and filled
All safety devices installed and checked for proper function-
ing
DANGER
Risk of injuries caused by running aggregate!
►
Do not touch the running aggregate.
►
Do not carry out any works on the running aggregate.
WARNING
Risk of injuries caused by hot pump parts or hot media to
be pumped!
►
Use protective equipment when carrying out any works on
the aggregate.
CAUTION
Risk of material damage caused by dry running!
►
Make sure the pump has been properly filled.
CAUTION
Risk of cavitation when throttling down the suction flow!
►
Completely open the suction-side fitting and do not use it
for controlling the flow rate.
►
Do not open the pressure-side fitting beyond the operating
point.
CAUTION
Risk of material damage caused by a closed pressure pipe!
►
Do not operate the aggregate when the pressure-side fitting
is closed.
►
Observe the minimum flow rate (
Operating limits,
1.
Completely open the suction-side fitting (if available).
2.
Open the pressure-side fitting (if available).
3.
Switch on the motor and provide for a smooth running
behaviour of the aggregate.
4.
When the nominal speed has been reached, set the operat-
ing point by means of the pressure-side fitting (if available).
5.
After the aggregate has been subjected to pressure and
operating temperature for the first time, check whether it is
tight.
6.2.2
Switch-off
WARNING
Risk of injuries caused by hot pump parts or hot media to
be pumped!
►
Use protective equipment when carrying out any works on
the aggregate.
1.
Switch off the motor.
2.
Close the pressure-side fitting (if available).
3.
Close the suction-side fitting (if available).
4.
Check all connecting screws and tighten if required (only
after initial commissioning).