![Speck pumpen CSY Series Скачать руководство пользователя страница 63](http://html.mh-extra.com/html/speck-pumpen/csy-series/csy-series_operating-instructions-manual_1341805063.webp)
Operating
Instructions
05/2011
1096.0833 | CY, CSY, LNY, LSY, NPY, PY, Y, YS Series
5
1.1 Target groups
Target group
Task
Operator
►
Keep these instructions available at the location of the
system, also for later consultation.
►
Advise staff to read and observe these instructions and the
provided documents, particularly the safety precautions and
warnings.
►
Observe additional provisions and regulations related to the
system.
Qualified staff, assembler
►
Read, observe and adhere to these operating instructions
and all applicable documents, particularly the safety precau-
tions and warnings.
Tab. 1
Target groups and their tasks
1.2 Applicable documents
Document
Purpose
ATEX additional instructions
Operation in potentially explosive areas (only applicable to
pumps designed for use in potentially explosive areas)
Declaration of conformity
Conformity with standards
Tab. 2
Applicable documents