OPERATING MANUAL PAT-800/805 version 1.09
32
Incorrect result: I
SUB
> LIMIT
Notes:
- Tested device must be turned on.
- Test circuit is electrically isolated from the mains and from PE mains lead.
- Test voltage is 25 .. 50Vrms
4.7 Measurement of PE leakage current
Press
I
PE
. After that meter is prepared for
measurement.
Connect the mains plug of the tested device into the test socket
of the meter. The measurement is made between shorted L, N
and PE. In addition, it is possible to carry out the measurement
with the probe connected to
R
ISO
-
socket (
R
ISO
for PAT-800).
Содержание PAT-800
Страница 1: ......
Страница 2: ......
Страница 58: ...OPERATING MANUAL PAT 800 805 version 1 09 56...
Страница 59: ......
Страница 60: ......