OPERATING MANUAL PAT-800/805 version 1.09
30
The measurement is performed similarly as in 4.5.1.
4.6 Measurement of substitute leakage current
I
SUB
current is measured at 25..50V voltage and its value is rescaled to the
nominal mains voltage set in menu (see 3.3.7).
Press
I
SUB
. After that meter is prepared for
measurement.
When parameters must be changed press
SET
. Setting is performed as in section 4.2.
For Class I, connect the mains plug of the tested device into
the test socket of the meter.
Содержание PAT-800
Страница 1: ......
Страница 2: ......
Страница 58: ...OPERATING MANUAL PAT 800 805 version 1 09 56...
Страница 59: ......
Страница 60: ......